Engineering Jobs

1,373 were found based on your criteria {{ paging.total|number:0 }} were found based on your criteria

show all
  • Hourly ({{ jobTypeController.getFacetCount("0")|number:0}})
  • Fixed Price ({{ jobTypeController.getFacetCount("1")|number:0}})
Fixed-Price - Expert ($$$) - Est. Budget: $200 - Posted
BACKGROUND: Please refer provided snapshots. This project comprise of two exchanger designs which physically appear as three bundles stacked together: - Exchanger 1A is an NEN exchanger mounted at the bottom. - Exchanger 2C/D are NEN exchanger of which the shell and tube sides are connected in series and mounted above Exchanger 1A. Please refer the datasheet. Both designs are very similar (i.e. same overall length and diameter as well as the tube size, quantity and layout) and to be constructed out of the same material. Note however: - Design pressure for the tube side are different between the two designs. If it is considered economical (i.e. only negligible thickness difference) ideally we want to make the designs identical. - There will be additional connections (vents / drains / instruments) which are currently being finalised of which quantity, size, connection type (flanged or threaded) and location may vary between bundles. - Shell side of all three bundles are interconnected so the bottom shell side to take into account static head from overall stacked exchanger. - Tube side only interconnected for the two upper exchanger. - Nozzle load to be considered (WRC analysis required) for inlet and outlet nozzles per allowable loads on SP-DUSUP-42-01. - Calculation to consider seismic design based on operating condition with the three exchanger stacked together (refer snapshot for combined COG and solidworks empty weight basis). - Wind design also to consider the three exchanger stacked together. - Transport design also to consider the three exchanger stacked together. - Lifting lug location will vary between the exchanger but the lug design will be identical. Design to be based on lifting all three exchanger together using the top exchanger lifting lugs. Please quote your best price to: - Review both design drawings against datasheets, provided specifications and above assumptions. - Update the drawings design data notes and table based on datasheet and specification (excel for this section will be provided). - Perform mechanical design using PV elite. PV Elite native file to be provided on completion. - Submit mechanical calculation reports for both designs in word document including PV Elite output as supporting document. Attachments: - 2065 Exchanger combined snapshot - 2065 10-A-102-E1A - PRELIMINARY DRAWING - 2065KM101 Rev A - 10-A-102-E 1 A - datasheet - 2065KM102 Rev A - 10-A-102-E 2 C & D - datasheet - SP-DUSUP-42-01_Rev-02 Vessel Design Basis - SP-DUSUP-42-02_Rev-02 Pressure Vessels-General
Skills: Engineering drawing Mechanical Design Mechanical Engineering
Hourly - Intermediate ($$) - Est. Time: Less than 1 week, Less than 10 hrs/week - Posted
The contract owner has a diagram and photos of similar items for consideration and ease of understanding of what's required. The device will require some engineering consideration to ensure that the item built to their design is safe and within the requirements of the job at hand.
Skills: Engineering Design
Fixed-Price - Expert ($$$) - Est. Budget: $5 - Posted
Dear Shastry, can you please quote your very best price and quickest lead time for a single cavity mould to produce component shown on attached sketch. Material: ...............................................PP Moulder: ..............................................120 tonne Dimension between tie bars:............410mm Max. Mould Height..............................400mm Mould Opening Stroke.......................370mm This component is low volume, so we only need mould performance for 100,000 shots.
Skills: Materials Engineering 3ds Max AutoCAD Manufacturing Design
Hourly - Intermediate ($$) - Est. Time: More than 6 months, 10-30 hrs/week - Posted
You can choose guest blogging,Link reclamation, long-tail link building or Reverse engineering or any tactics. I do not care as long as it won't penalize my site and builds value over time.
Fixed-Price - Intermediate ($$) - Est. Budget: $5 - Posted
Greetings from Valuepoint Knowledgeworks Pvt. Ltd,India! We are one of Asia’s leading Translation and Localization Company with 15 years of experience. We are an ISO 9001:2008 and ISO 27001:2013 certified linguistic providers. Our service provision includes Translation, Voice-over, Multimedia, Staffing, Interpretation, Transcription, Sub-titling and so on. Currently we have a requirement for translation for ongoing project Eng< Azerbaijani for Manufacturing/ Electrical machines domain If interested, please send in the following ASAP to know more Updated CV Per day output Availability - Part time/Full time Best rates (Considering a long term collaboration) Also, requesting if you can share any references of your Friends or colleagues who wish to work with us. Please mention your Skype id for easy communication. Appreciate your timely support. Best regards, Sourcing
Skills: Electrical engineering Machine Design Manufacturing Translation
Fixed-Price - Intermediate ($$) - Est. Budget: $100 - Posted
Creating and reviewing question bank for "LED Light Repair Technician" job role. In this job role, the individuals at work check the non-functional LED light in a systematic manner to find out the fault; dismantle it; repair the fault and reassemble the light to make it functional. The question bank should revolve around these topics only.
Skills: Electrical engineering Content Writing