Oracle Primavera Jobs

3 were found based on your criteria {{ paging.total|number:0 }} were found based on your criteria

show all
  • Hourly ({{ jobTypeController.getFacetCount("0")|number:0}})
  • Fixed Price ({{ jobTypeController.getFacetCount("1")|number:0}})
Hourly - Intermediate ($$) - Est. Time: Less than 1 month, 10-30 hrs/week - Posted
I have a building that I want to convert into a live work space and I need an architect to assist me with creating drawings and designing the building. We have specifications available for applicants to review upon request. Ideal Candidate will facilitate designing and managing the project including, but not limited to shop drawings, submittal fabrication packages, material take-offs, requisitions, material nesting/tracking and related correspondence, analyzing, problem solving, and quality control. Develops formal capital appropriations document that details scope, objectives, justification options, installation and Code Compliance.
Skills: Oracle Primavera AutoCAD Engineering Design