Building Estimation Jobs

23 were found based on your criteria {{ paging.total|number:0 }} were found based on your criteria

show all
  • Hourly ({{ jobTypeController.getFacetCount("0")|number:0}})
  • Fixed Price ({{ jobTypeController.getFacetCount("1")|number:0}})
Hourly - Entry Level ($) - Est. Time: More than 6 months, 10-30 hrs/week - Posted
I'm a small demolition contractor in US. When I hear of a job opportunity, I need to estimate how much it will cost to complete the work - in less than 24 hours. I need someone with a keen eye for detailed engineering to do accurate "takeoff quantities." This means quickly (and precisely) taking dimensions and calculating volumes of architectural elements (from drawings) to be removed in demolition. Use drawings to inform estimated work, i.e. "5,000 sqft of 6" reinforced concrete slab," or "10,000 lf of brick exterior wall 9 inches think and 40' high."
Skills: Building Estimation Architecture AutoCAD Construction
Hourly - Intermediate ($$) - Est. Time: More than 6 months, Less than 10 hrs/week - Posted
We are a real estate development company with in house general contracting entity. We are looking for an building industry professional who is capable of providing materials take offs from building plans, estimates using RS Means (or equivalent), familiar with using UDA Construction (scheduling, job costing, RFI's etc). The ideal candidate will have experience in all skills listed above, be fluent in English and have means to communicate via skype messaging, be able to meet deadlines (MANDATORY), and have access to all software needed to provide the work described.
Skills: Building Estimation Construction Project management Project Management professional
Hourly - Expert ($$$) - Est. Time: More than 6 months, 10-30 hrs/week - Posted
We are a construction company and we are looking for an experienced estimator that can produce takeoffs and create an Excel file with all the quantities. We will need the following knowledge, and prior to hiring, will be tested. -Drywall and Framing -Interior and Exterior Paint -Concrete, CMU Walls, Foundations, Slabs -Stucco The software to be used is Planswift. Working knowledge of Excel is also a must. We will need you to produce all takeoffs through Planswift so we can review later, and all quantities are to be inputted into Excel. If hired, we will train on the specific template we are using. Please submit some sample estimates you have produced for clients, and to know you read all the requirements prior to submitting a proposal, please write "007" on the first line. Thank you.
Skills: Building Estimation Construction
Hourly - Intermediate ($$) - Est. Time: Less than 1 week, 10-30 hrs/week - Posted
I need help with three things: 1) HVAC Design 2) Duct work and piping design for HVAC system. This will change the architecture and structural framework of the rooms. So, I will need help adjusting the design and completing the architectural design. 3) Material and structural Choices for internal architecture. I'm looking for help designing the optimal HVAC system for a commercial warehouse. The warehouse will be split into 10 to 12 rooms. Each room will have its own environmental controls and will be regularly steam cleaned at 120C. 18 to 20 foot ceilings. The goal of the project is to design a very low cost, but efficient and effective system to take an existing empty warehouse and construct a set of 10 to 12 environmentally controlled manufacturing rooms. Each room is controlled separately. Some rooms may be hot (120C), while other rooms are cold (50F) at the same time. Each room is subject to high moisture and water. The last two rooms are cold rooms for storage and shipping. Those rooms will always be cold (35F). I will also need help designing the internal structure more. I will need duct work and piping designed once the HVAC system is decided. I need help figuring out how much the HVAC system will cost. I'm also looking for help on internal architectural design and building code regulations. The rooms need to be water tight and well insulated. So I will need to make important choices of materials to use for each layer of the framing, insulation, wall boards, floors and ceiling. They need to look clean and be easily cleanable. It also needs to be fairly cheap to modify an empty warehouse to achieve this.
Skills: Building Estimation Architecture Building Regulations Construction
Hourly - Entry Level ($) - Est. Time: More than 6 months, Less than 10 hrs/week - Posted
We are a Plastering/Drywall subcontractor business based in Australia. We specialise in the installation of Plasterboard/Drywall and minor renovations. We are looking for someone to take measurements from construction plans and maybe place orders with supplier. Please don't hesitate to ask if you have any questions.
Skills: Building Estimation Construction Quantity Surveying
Hourly - Entry Level ($) - Est. Time: Less than 1 week, Less than 10 hrs/week - Posted
Hi - Im looking for an architect to deign house from plans supplied. Supply 3 differant design schemes to which pratical use of space would be maximised Plans supplied are very simple and need someone to add abit of deign to the proposed house. All rooms on plan are a wish list - also house needs to be laid out to the similar one supplied.
Skills: Building Estimation ArchiCAD Architecture Architectural Rendering
Hourly - Intermediate ($$) - Est. Time: Less than 1 week, 10-30 hrs/week - Posted
I'm looking for someone with commercial building design experience to help me work out the high level costs and design for an industrial manufacturing facility. The work is for a practical business plan. Once the most important high level decisions are made on the design, I'll need help refining the details to make sure we get the design and business plan choices right. It will be important to keep costs low so that startup risk is minimized, but it's also important to get it right so that the hassles caused by mistakes don't derail the business. The building would be built on the United States east coast (West Virginia, Pennsylvania, Delaware, etc). It definitely will not be built any farther north than Pennsylvania. There is a small chance it will be built in California because its investors may want the facility closer to them and there is a good chance they'll be in California. The facility only one floor with at least 15,000 sq ft. and the height of the building must be at least 20 feet inside. It may be desirable to build the ceilings as high as 50 feet. The building needs to have good insulation because the climate inside will be controlled. -1/4th of the building will have large regions refrigerated to 34F. -1/4th of the building will be uncontrolled except to prevent freezing. This portion will have 2 very large (ideally square) storage containers that are dispensed at the bottom. The exact height of the containers depends on the size of the facility it supports but should. -1/4th of the building will be 70F to 320F. Sometimes the room will need to have hot steam piped in to allow air flow while maintaining high temperatures. -The last 1/4th of the building will be broken into 6 rooms that are usually around 50F to 70F and will require lots of AC (during hotter months) or heat (during colder months) to maintain that temperature with sufficient air flow. If you've read this brief, please tell me about projects in the US you've done that make you qualified to advise me on this project.
Skills: Building Estimation Architecture Building Regulations Civil Engineering