FRP Stair Assemblies & Sub Frames

Closed - This job posting has been filled and work has been completed.
Engineering & Architecture Product Design Posted 1 year ago

Fixed Price

Delivery by April 18, 2014

$100.00

Budget

Details

Please work through the attached pages and redraw into a range of assembly, sub frame and detail drawings.

The drawings need to be detailed so an engineer can sign off.

Each item has to be clearly labelled with drawing notes where applicable.

All materials are Permastruct FRP


About the Client

(4.99) 34 reviews

Australia
Perth 02:58 PM

46 Jobs Posted
92% Hire Rate, 1 Open Job

Over $10,000 Total Spent
43 Hires, 3 Active

$14.39/hr Avg Hourly Rate Paid
163 Hours

Member Since Feb 11, 2014