Gailes mental health units

Closed - This job posting has been filled and work has been completed.
Engineering & Architecture 3D Modeling & CAD Posted 1 year ago

Hourly Job

More than 30 hrs/week
Less than 1 month
$$

Intermediate Level

I am looking for a mix of experience and value

Details

We have completed the electrical, hydraulic, and mechanical design for a  non secure mental health unit. These are basically 6 blocks of single storey and 2 storey apartments ( typically 6 units per block) with a communal and administration building. We have now been commissioned to carry out the design for another site with an almost identical layout. We require a competent building services cad technician to take the existing sites design and transpose this to the new site. It will require a bit of technical input to reposition elements as the apartment blocks aren't identical, but no additional design is required.. Estimated time to complete is 2 weeks. I have attached the site plan to give a feel for the size of the development.


About the Client

(5.00) 1 review

Australia
Brisbane 05:31 PM

1 Job Posted
100% Hire Rate, 1 Open Job

$4,565 Total Spent
1 Hire, 0 Active

$15.00/hr Avg Hourly Rate Paid
304 Hours

Member Since Jan 6, 2014