Blue Print Analysis & Material Summary

Engineering & Architecture Product Design Posted 2 years ago

Hourly Job

Hours to be determined
Less than 1 week

Details

We need a set of blue prints analyzed and broken down into metrics and a concise material list so that we can determine a proper cost for the execution of this project.  We need a breakdown of the drywall, trim and painting.

For a quick overview, I need the following:

I need a material break down.  I need to know how many sheets of drywall we'll be required to buy.  I need to know what sizes of drywall need to be purchased.  I need to know where the various sizes of drywall will go.  I need to know how much scaffolding will be required to in order to reach all areas of the house that require drywall installation.  I need to know how many screws will be required for the installation.  I need to know how many rolls of tape will be required in order to tape all the seams in the residence.  I need to know how many boxes of drywall compound will have to be purchased in order to yield a level 5 finish.  I need to know how many interior doors are being installed.  I need to know how many jambs, casings and baseboards will be required in order to trim the house.  I need to know how much paint is required to prime the residence.  I need to know how much ceiling paint is required to paint the ceilings 2 coats.  I need to know how much trim paint is required in order to paint all the trim and doors 2 coats.  I need to know how much paint is required to paint all the rooms 2 coats.  I need all these variables and more borken down into a comprehensive analysis of each room in the house and then a total per level and the a grand total summary.

Open Attachment

Skills Required:

Client Activity on this Job

Last Viewed: 2 years ago

Applicants: 23

Hired: 4


About the Client

(4.90) 50 reviews

Canada
Waterloo 06:21 AM

114 Jobs Posted
64% Hire Rate, 1 Open Job

Over $10,000 Total Spent
84 Hires, 8 Active

$12.39/hr Avg Hourly Rate Paid
470 Hours

Member Since Feb 10, 2010