You will get a project incharge,supervisor,autocad operator,project management

You will get a project incharge,supervisor,autocad operator,project management

Project details
Dear Hiring Manager, I am excited to be applying for the Mechanical Engineer position. I have an astute attention to detail that is required by the highest quality engineering professionals and look forward to working alongside some of the best in the industry.
Target Country
United States, Canada, ItalyWhat's included
Service Tiers |
Starter
$500
|
Standard
$1,000
|
Advanced
$2,000
|
---|---|---|---|
Delivery Time | 3 days | 3 days | 30 days |
Number of Projects | 30 | 30 | 10 |
General Project Consulting | - | ||
Define Project Goals | |||
Define Deliverables & KPIs | - | - | |
Establish Schedule & Milestones | - | - | |
Risk Management | - | ||
Resource Management | |||
Budget Management | - | ||
Project Reports | - | - | |
Project Diagrams Provided | - | - |
Optional add-ons
You can add these on the next page.
Fast Delivery
+$20 - $100
Additional Project
(+ 7 Days)
+$100
Budget Management
+$100About Mc Joelord
Hvac engineer,MEP engr,supervisor,management engineer
Quezon City, Philippines - 2:22 pm local time
A challenging and rewarding position with a well-established company where expansion of knowledge
and fine-tuning of the employee's skills and experience in customer service are the benefits that
will help me in my future career, Qualification Summary:
-Board Passer, Registered Mechanical Engineer.(0093594)
-MEPFS engineer(BUREAU OF IMMIGRATION BUILDING,STA LUCIA HIGH RISE BUILDINGS)
-MEPFS engineer(SPARC PROJECT HIGH RISE BUILDING PARANAQUE)
-Have knowledge of Project management proper documentation. (manpower report, daily activities report, weekly and monthly accomplishment report) and knowledge of handling manpower of trade contractor, sub-contractor.
-Field Safety Engineer. (Papertech Warehouse Facilities Project).
-Project Mechanical in-charge. (Papertech Warehouse Facilities Project)
-Project Supervisor of Electrical works. (Papertech Warehouse Facilities Project)
Have Excellent knowledge in AutoCAD Designing, Shop-drawing, As-built of Mechanical and Electrical works and
-Have Excellent Knowledge of Sketch-up. (Designing of 3D perspective housing project. High rise building.
-Expose of Manufacturing Maintenance.
-Supersonic Wire industry.
-CAPASCO manufacturing.
Project in-charge.(POEA project)(Beam and Column Retrofitting’s).
Sincere, dynamic and hard – working.
Has the ability to multi-task, prioritized assignments, and be flexible in cross-functional duties.
EXPERIENCE:
JAN 30 2020-PRESENT
JMCORPUZ BUILDERS CORPORATION
MEPF CONTRUCTOR
PROJECT ASSIGNED
*Bureau of immigration (main office building)-Diosdado macapagal ave,boulevard,pasay city.
*Ventura mall-Dasmarinas Cavite
*SOTO grande condotel baguio
*NASACOSTA RESIDENCE CONDOTEL TOWER 1-Nasugbu,Batangas
*Catalina Residence Condotel bldg.-Bauan batangas.
*UNI ASIA warehouse-Tanza cavite
PROJECT MECHANICAL INCHARGE/MEPF ENGR
1.Air-conditioning system
*Installation of chilled water system(cooling tower,chiller units).
*Installation of VRF(Variable refrigerant flow) system.
*Installation of SPLIT TYPE air-conditioning system.
-Daily monitoring of installation to ensured the quality and long term capability of system
-Coordinate other trades that will conflict to installation.
-Brainstorming about installation as per site condition.
-Testing and commissioning for air-conditioning system(leak test/pressure test, punctuality test)
-Estimate materials to be used(copper pipe,insulation and etc)
2. Ventilation system
*ERV(Energy recovery ventilation)
*Exhaust ventilation
*Smoke evacuation system
*Pressurization system.
-Ensured installation of ducting have quality(workmanship, materials used approved by consultant)
-Implement testing(light test,smoke test) for horizontal and vertical ducting for quality assurance purposes.
-Coordination of blower units specs(load schedule for electrical contractor,dimension of blower unit for mechanical contractor).To minimize conflict with other trades.
-Ensured setting out of ducting will not conflict with other trades.
-Brainstorming about installation of ducting base on actual/site condition.
-Estimate materials to be used(pvc,ducting and etc)
-Provide schedule of works
3.Fire protection system
*Sprinkler system
-Monitoring of installation that will base on construction plan.
-Ensured quality of workmanship to done.
-Testing and commissioning(leak test,pressure test)
-Coordinate other trades conflict on installation as per site condition
-provide revised shop drawing base on approved plan of consultant.
-Coordinate NBF consultant about conflict on fire pump and fire tank approved plan to ensure quality of installation.
4.Plumbing works
1. Sanitary line lay-out
2. Storm drainage lay-out
3. Waterline lay-out
-Monitoring of installation that will base on construction plan.
-Ensured quality of workmanship and materials to be used.
-Provide revised shop drawing base on site condition.
-Coordinate with other trade about conflict of installation.
-Estimation of additional work materials.
-Brainstorming about installation as per site condition(conflict with piping layout)
-testing and commissioning(leak test,gravity test)
-Provide shop drawing for installation.
General works.
-Provide billing percentage as per actual installation.
-Evaluate billing of MEPFS contractor as per actual installation.
-Provide shop drawing for installation.
-Estimate of additional materials.
-Coordination with other contractor that will conflict on installation.
-Attend meeting to owner and consultant about concern with MEPFS works
-Provide schedule of works.
-Provide weekly accomplishment.
JAN 15 2018-JAN 28 2020
IRONCON builders & development corporation
General construction
SPARC BURGUNDY PROJECT(Proposed renovation of 33 storey building).
*MEPFS ENGINEER
HVAC system
1.Air-conditioning system
*Installation of chilled water system(cooling tower,chiller units).
*Installation of VRF(Variable refrigerant flow) system.
*Installation of SPLIT TYPE air-condition
Steps for completing your project
After purchasing the project, send requirements so Mc Joelord can start the project.
Delivery time starts when Mc Joelord receives requirements from you.
Mc Joelord works on your project following the steps below.
Revisions may occur after the delivery date.
project plan,specification,project schedule
need clear details for every plan and specification to be use.