You will get a detailed estimate of Concrete, Masonry, Rebar & Formwork
Project details
✅ This offer includes:
⭐ Concrete estimate: Slab, footing, grade beam, column, foundation wall, retaining wall, pavements, curbs, etc
⭐ Rebar estimate: Rebar length, Rebar weight (Tonnage).
⭐ Formwork estimate: Formwork for suspended slabs, columns, walls, etc
⭐ Masonry estimate: CMU Block wall, CMU Bond Beam, stone veneer, brick veneer, etc
"Looking forward to long-term working relationships with clients"
📱Always available for queries & discussion
Thanks & Regards.
Ahmad Usman
⭐ Concrete estimate: Slab, footing, grade beam, column, foundation wall, retaining wall, pavements, curbs, etc
⭐ Rebar estimate: Rebar length, Rebar weight (Tonnage).
⭐ Formwork estimate: Formwork for suspended slabs, columns, walls, etc
⭐ Masonry estimate: CMU Block wall, CMU Bond Beam, stone veneer, brick veneer, etc
"Looking forward to long-term working relationships with clients"
📱Always available for queries & discussion
Thanks & Regards.
Ahmad Usman
Project Scale
Building ComplexBuilding Type
Commercial, Industrial, ResidentialFile Format
PDFWhat's included
Service Tiers |
Starter
$40
|
Standard
$75
|
Advanced
$100
|
---|---|---|---|
Delivery Time | 1 day | 2 days | 3 days |
Number of Sq. Ft. | 3000 | 5000 | 10000 |
Number of Revisions | 3 | 3 | 3 |
3D Modeling | - | - | - |
Mood Board & Inspiration | - | - | - |
Source Files | |||
High Level of Details |
36 reviews
(34)
(1)
(0)
(1)
(0)
This project doesn't have any reviews.
BM
Bryan M.
Jan 13, 2025
757 Seacoast Project
PL
Patrick L.
Jan 8, 2025
1651 23rd St MB
BM
Bryan M.
Jan 4, 2025
3842 39th Street Estimate
BM
Bryan M.
Jan 4, 2025
4059 Louisiana Project Estimate
Was very professional and completed his tasks as contracted.
JM
James M.
Dec 10, 2024
Construction Drawing Take Offs for Steel Itemization
Ahmad did an outstanding job with our steel takeoff project. He demonstrated exceptional attention to detail, accuracy, and professionalism throughout the process. He communicated clearly and promptly, delivered exactly what we needed within the agreed timeline, and provided thoughtful, well-researched cost estimations supported by reliable data sources. His work quality and dedication exceeded my expectations. I look forward to working with Ahmad again on future projects and would highly recommend him to anyone seeking top-tier construction estimating services.
About Ahmad
Construction Estimating & Quantity Takeoffs
100%
Job Success
Lahore, Pakistan - 2:13 am local time
As a construction estimator with over eight years of experience, I specialize in providing accurate, time-efficient takeoffs that empower contractors to secure more profitable projects. In today's competitive market, precise quantity estimates are crucial for success.
I’m equipped with:
● Plan Swift Professional
● Blue-beam Revu
● RS Means Cost Data 2025
● Microsoft Excel
My services include:
● Comprehensive Scope Analysis: Thoroughly examine project plans to identify and quantify all scope items.
● Detailed Takeoffs: Accurate measurements and calculations using industry-leading software like Planswift.
● Clear Communication: Open collaboration ensures your project needs are fully understood and met.
● Supporting Documentation: Detailed scope notes, checklists, takeoff images, and materials lists.
By partnering with me, you can:
● Increase Bid Accuracy: Reduce errors and improve your chances of winning bids.
● Enhance Profitability: Optimize material procurement and project management.
● Save Time: Streamline your bidding process and focus on other critical tasks.
Ready to take your construction business to the next level? Contact me today to discuss your specific needs.
Sincerely,
Engr. Ahmad
Estimating 360
Steps for completing your project
After purchasing the project, send requirements so Ahmad can start the project.
Delivery time starts when Ahmad receives requirements from you.
Ahmad works on your project following the steps below.
Revisions may occur after the delivery date.
Quantity Takeoff & Cost Estimate
First I will extract quantities from pdf drawings. Then I will add material and labor rates. At the end, i will add overhead, profit, and insurance.