You will get a Detailed Take-offs and Cost Estimate for your Construction Projects.

You will get a Detailed Take-offs and Cost Estimate for your Construction Projects.

Project details
You will get a detailed cost estimate of your project which helps you win bids in the most economical budget and best turnaround time. Also, you get a detailed material breakdown to purchase your materials for construction works.
Field of Expertise
Structural EngineeringBuilding Type
ResidentialBIM Software
Autodesk Revit, Bluebeam Revu, OtherFile Format
RVT, DWG, OtherWhat's included
Service Tiers |
Starter
$50
|
Standard
$120
|
Advanced
$200
|
---|---|---|---|
Delivery Time | 1 day | 3 days | 5 days |
Number of Revisions | 1 | 1 | 2 |
Optional add-ons
You can add these on the next page.
Fast Delivery
+$50 - $100
Additional Revision
+$20About Bilal
Estimate Engineer | Quantity Surveyor | Construction Estimator
Lahore, Pakistan - 11:18 pm local time
Me, a Civil & Estimate Engineer. I will serve you Construction Estimate i.e., material, quantity take off and cost estimation for residential and commercial projects. I have years of working experience in field of estimation, especially for a USA based estimation company. i will prepare Construction Estimate, Bill of quantities, Cost estimation and material take off for all types of Construction projects
Preparing MS Excel sheets and projects reports also.
My services include
01- Earthwork & Sub- Structure (Footings, Piles & Grade Beams)
02- Demolition & Renovation Works
03- Concrete (P.C.C & R.C.C)
04- Masonry (CMU, Stone & Brick)
05- Metal (Light Gauge & Heavy Gauge Metal Framing, Structural Rebars etc.)
06- Wood, Plastic & Composites (Lumber Structural Framing, Studs Sheathing, Hardware, Millwork, Rough Carpentry)
07- Thermal & Moisture Protection (Insulations, Den glass Sheathing, Flashings & Others)
08- Openings (Doors, Windows, Skylights, Transoms & Access Panels)
09- Finishes (Gypsum/ Plaster Board, Sheetrock, Paints, Ceilings)
10- Specialties (Grab Bars, Mirrors, Ladders, Other Accessories)
11- Equipment
12- Furnishing (Marble, Stone, Quartz Countertops)
13- Special Construction (Pre- Fab. Buildings, Pools)
21- Fire Protection System (Sprinklers, Piping, Controller System)
22- Plumbing (Hot Water, Cold Water Sanitary, Gas Pipe Lines, Fixtures & Fittings)
23-HVAC (Ductwork, Air Devices)
26- Electrical (Receptacles, Switches, Lighting Fixtures, Feeder, Panel Boards, Breakers & Feeders)
28- Electronic Safety and Security (Detectors & Sensors)
31- Earthwork (Cut & Fill)
33- Exterior Improvement (Paving, Irrigation System, Landscaping, Fencing)
I will do Construction Estimate, material take off and cost estimation of residential, apartment & commercial projects from foundation to finishing.
Steps for completing your project
After purchasing the project, send requirements so Bilal can start the project.
Delivery time starts when Bilal receives requirements from you.
Bilal works on your project following the steps below.
Revisions may occur after the delivery date.
Reviewing Drawings & Specifications
Read Plans and related documents in detail and clear the scope of work.
Take-off
Do Take-off using computer-aided software like Panswift, Buebeam, or On-Screen Takeoff. Scaled the drawings and got the required quantities.