You will get a organic rankine cycle equipment designed

You will get a organic rankine cycle equipment designed

Project details
You will get a complete organis rankine system designed, mechanical equipment, P&ID, electrical system, control system, power evacuation method, control and use of power generated from orc.
Materials
MetalField of Expertise
MachineryDesign Software
OtherFile Format
PDFWhat's included
Service Tiers |
Starter
$1,000
|
Standard
$2,000
|
Advanced
$4,000
|
---|---|---|---|
Delivery Time | 30 days | 60 days | 60 days |
Number of Revisions | 4 | 6 | 8 |
Number of Technical Drawings | 4 | 6 | 8 |
Concept Development | - | - | - |
3D Model | - | - | - |
Source Files | - | - | - |
About Ravindra
Designer of industrial equipments/ 24years experience
Vadodara, India - 6:05 pm local time
Calculation for designing is my hobby
Steps for completing your project
After purchasing the project, send requirements so Ravindra can start the project.
Delivery time starts when Ravindra receives requirements from you.
Ravindra works on your project following the steps below.
Revisions may occur after the delivery date.
Feasibility of using the waste heat is evaluated
Quantum of waste heat available, checking the feasibility to use it for ORC, selection of organic fluid to use, calculation of power that can be recovered, installation cost of equipment
Design of heat exchangers, condensor, evaporator, expander tubine,
Design of evaporator heat exchangers, condensor heat exchangers, expander and generator , valves and complete piping, working medium pump, piping and valves