You will get An Accurate Quantity Surveying, Estimate & Takeoff by Affordable Price.

You will get An Accurate Quantity Surveying, Estimate & Takeoff by Affordable Price.

Project details
In this Project, you will get the quantity surveying, estimate and material takeoff for construction. I quantify building bridge, roads, materials faster and more accurately than most estimators.
I will provide you with quantity surveying and material takeoff for construction.
Civil work
• Concrete
• Brickwork
• Carpentry
Architectural work
• Tiling
• Walls, floors and ceilings
• Glass
• Paintwork
• Plaster
Steel work:
• Anchor Bolt, Column, Rafter, Beam, Strut, Bracing, Purlin, Sheeting
Structure:
• Production Building, Warehouse, Tank yard, Pipe Rack, Conveyor belt support,
Why hire me:
〚i〛Familiarity with heavy construction projects or industrial projects
〚ii〛 Familiarity with process mechanical components
〚iii〛Experience in the material waste sector
〚iv〛 Knowledge of CMAR, CMS and Hard-Bid estimates
〚v〛 Construction field experience
〚vi〛 Cost control and scheduling exposure
〚vii〛 Free Support 24/7 until the work is satisfied.
If you have any questions, please ask. I am humbled and would love to answer those for you.
Firoz Hossain
I will provide you with quantity surveying and material takeoff for construction.
Civil work
• Concrete
• Brickwork
• Carpentry
Architectural work
• Tiling
• Walls, floors and ceilings
• Glass
• Paintwork
• Plaster
Steel work:
• Anchor Bolt, Column, Rafter, Beam, Strut, Bracing, Purlin, Sheeting
Structure:
• Production Building, Warehouse, Tank yard, Pipe Rack, Conveyor belt support,
Why hire me:
〚i〛Familiarity with heavy construction projects or industrial projects
〚ii〛 Familiarity with process mechanical components
〚iii〛Experience in the material waste sector
〚iv〛 Knowledge of CMAR, CMS and Hard-Bid estimates
〚v〛 Construction field experience
〚vi〛 Cost control and scheduling exposure
〚vii〛 Free Support 24/7 until the work is satisfied.
If you have any questions, please ask. I am humbled and would love to answer those for you.
Firoz Hossain
Project Scale
BuildingBuilding Type
Commercial, Industrial, ResidentialFile Format
DWG, JPG, PDFWhat's included
Service Tiers |
Starter
$10
|
Standard
$20
|
Advanced
$30
|
---|---|---|---|
Delivery Time | 1 day | 2 days | 3 days |
Number of 2D Drawings | 1 | 2 | 3 |
Number of Sq. Ft. | 1000 | 2000 | 3000 |
Number of Revisions | Unlimited | Unlimited | Unlimited |
3D Modeling | - | - | - |
Mood Board & Inspiration | - | - | - |
Source Files | |||
High Level of Details |
Optional add-ons
You can add these on the next page.
Fast Delivery
+$10 - $20About Firoz
Estimator, Quantity Surveying, Take off, BOQ, BBS, Auto Cad
Dhaka, Bangladesh - 2:52 pm local time
Looking for a Quantity Surveyor, Estimator, Quantity Take-off? Yes, You are in the right place. I am experienced on Quantity Surveyor, Estimator, Quantity Take-off.
I have done Bachelors' in Civil Engineering. I am an expert Quantity surveyor, Estimator, and Material Take Off Specialist who is working permanently with many companies as Estimation Engineer. I just need Estimating PDF Drawings, and I will do the takeoff and quantity Estimate for you. I am in the estimating business for more than 7 years and have done all kinds of projects ranging from residential estimating to commercial estimating with all CSI divisions. I have been doing a job in cost estimation for almost 7 years, and I am good at making accurate Excel sheets.
The projects I have dealt with are majorly from the USA Estimation. I have excellent skills in Plans Swift, Bluebeam Revu, and MS Excel.
The Planswift takeoff sheet will include everything as per client requirements, and the breakdown will be as much as the client needs. IF you are looking for
Civil Works: (Estimate or Quantity Surveying or Quantity Takeoff, BOQ, BBS).
- Earthworks, Excavation, Backfilling,
- Pile, Shoring,
- Foundation
- Concrete, Concrete Reinforcement, Formwork, Brick work, Brick wall, Masonry, Retaining Wall
- Pipes & Drainage (stormwater, water, sewer, fire)
Architectural Works: (Estimate or Quantity Surveying or Quantity Takeoff, BOQ).
- Floor Finishes, Tiling, Epoxy Floor Takeoff, and Quantity Estimator
- Doors, Windows, Roller Shades
- Ceilings, Drywall, Partition Takeoff, and Quantity Estimator
- Painting, Rendering, Cladding Takeoff and Quantity Estimator
- Roofing, Deck, Waterproofing Takeoff and Quantity Estimator
- Precast, Glass Fiber, Reinforced Concrete
Steel Structural Works: (Estimate or Quantity Surveying or Quantity Takeoff, BOQ).
- Steel Structure Name: Warehouse, Production building, Pipe rack, Conveyor Support, Connecting Bridge.
- Steel Structure Part: Roof, Wall, Monitor, Canopy, Platform or Mezzanine Floor, Gutter, Cage ladder, Downspout, Life line etc.
- Anchor bolt, Column, Rafter, Beam, Strut, Bracing, Purlin, Girt, Flange brace, Sag rod, Channel, Bend cleat, Sheeting. Cage ladder, Downspout, Life line etc.
- Miscellaneous Steel Structure Estimation.
Who is this for:
1. Busy Contractors who do not have time for Quantity Estimating and Takeoff.
2. Contractors who want to grab bigger fish and build the brand.
3. Hit more chances to win competitive jobs
What I Need From You:
1. PDF Drawings and Instructions.
2. Project Specification.
3. Tendering document, Steel detailing or Steel wait (For steel structure).
What you will get:
Takeoff Excel Sheet
Pricing Done for Each Line Item
Turnaround is 2-3 working days depending on the complexity of a project
Utilities, Landscaping, and much more, which includes general requirements and site work. I also do Renovation projects with demolition
Kind Regards,
Firoz Hossain
Steps for completing your project
After purchasing the project, send requirements so Firoz can start the project.
Delivery time starts when Firoz receives requirements from you.
Firoz works on your project following the steps below.
Revisions may occur after the delivery date.
Project Quantity Surveying, Estimate & Takeoff
Project Submission.