You will get an Arc Flash study for 200kVA or less system
Top Rated
Project details
Arc Flash Study/Report based on NFPA70E & IEEE 1584-2018 for an industrial/commercial electrical system. This project considers a max power rating of 200kVA or less for the main service panel. It will model in ETAP software considering all the inputs I indicated. You will get a report with a summary of calculation, incident energy, working distances, and warning Labels similar to the gallery image, PPE, Etap file.
Field of Expertise
Mechanical, Electrical, & PlumbingBuilding Type
CommercialBIM Software
OtherFile Format
Other$1,500
- Delivery Time 10 days
- Number of Revisions 1
58 reviews
(58)
(0)
(0)
(0)
(0)
This project doesn't have any reviews.
JG
John G.
Jan 17, 2025
P24-039 PROVIDENCE, PETALUMA GENERATOR DESIGN
JG
John G.
Nov 19, 2024
P24-039 PROVIDENCE, PETALUMA GENERATOR DESIGN
JG
John G.
Nov 6, 2024
P22-005 USCF MZ L1 CORRIDOR AUTO DOOR GP6464
JG
John G.
Sep 30, 2024
P23-019 AH SELMA PYXIS
SH
Steven J. H.
Sep 9, 2024
Lighting Layout
Excellent work! A+++
About Jesus
Electrical Engineering | Power Systems | etap | AutoCAD Electrical
100%
Job Success
Valencia, Venezuela - 8:03 am local time
"Thank you for your hardwork Jesús. We appreciated your motivation and your positivity..."
Professional expertise in Engineering Design Projects and Management Positions. MEP, Oil&Gas, Industrial, Commercial, Solar PV, and Utility Engineering Projects.
☑Electrical Engineering (Power Systems) / Electrical design and calculations.
☑Cad Drafting & AutoCAD Electrical (ACADE) - Expert.
☑Power System Analysis / Electrical Studies (ETAP & DigSilent) / Fault analysis / Reports /
Protective device coordination / Arc Flash / Load flow / Short circuit
☑Title 24 sheets - 2022 / Lighting Controls.
☑Drawing Set for Permits & Construction Documents. Experience with AHJ in CA.
☑Single line diagram, Three lines, Control schematics, Panel - Equipment layout, Earthing/Grounding, Cable sizing, Lighting and power, Panel schedule, Load calculations.
☑MEP Engineering.
☑Lighting calculations and models (DiaLux).
☑Project Management.
☑Spreadsheets (Excel and Google sheet).
☑European and American standards.
I enjoy well-planned work and being a good team player. I am delighted to have flexible working schedules and freelancing, and I always give my best to meet project objectives.
Steps for completing your project
After purchasing the project, send requirements so Jesus can start the project.
Delivery time starts when Jesus receives requirements from you.
Jesus works on your project following the steps below.
Revisions may occur after the delivery date.
Review of input information
Input information will be reviewed to see if included all the input data needed
Model construction
Construction of the Electrical system in the software.