You will get design lay-out for electrical smoke detector plumbing system

You will get design lay-out for electrical smoke detector plumbing system

Project details
All of my design wheather it is Electrical Circuit, Smoke Detector Lay-out, CCTV Lay-out or even Plumbing. It is all based on the standard of the National Electrical Code of USA and the United Plumbing Code of United States of America. Rest assure that it is 100% good quality and original in aspect. It will be submitted to you via PDF File or Autocadd file.
Field of Expertise
Mechanical, Electrical, & PlumbingBuilding Type
ResidentialBIM Software
Autodesk AutoCADFile Format
DWGWhat's included
Service Tiers |
Starter
$5
|
Standard
$8
|
Advanced
$20
|
---|---|---|---|
Delivery Time | 3 days | 7 days | 10 days |
Number of Revisions | 1 | 3 | 4 |
Number of Parametric Families | 1 | 2 | 4 |
Level of Detail | 1 | 3 | 5 |
Number of Materials | 2 | 4 | 6 |
Frequently asked questions
About Joseph Jason
Electrical Designer for Residential, Commercial and Highrise Building
Dasmarinas, Philippines - 8:40 pm local time
Electrical, Plumbing, & Mechanical Coordination, Design, and Implementation
Property Management and Facility Management (BPO)
Real Estate Development
Project Management (Construction)
Building Operation and Maintenance
A gradute of a degree in Bachelor of Science in Electrical Engineering from MAPUA UNIVERSITY. Mapúa is a top Asian university, entering the prestigious Quacquarelli Symonds (QS) Asia University Rankings for 2019. It is also the first school in Southeast Asia to obtain accreditation from the United States-based ABET.
My other credentials are as follows:
a.) Design for Commercial and Highrise Buildings in Accordance with IEEE 241-1990 and PEC part 1
By: World Electro-MechSystem Management Inc. (Dec. 2-3, 2015) (2 days of seminar and workshop).
b.) Certificate of Completion in AutoCad 2008 2D & 3D
By: Microcadd Technologies Co., Inc. Cubao Quezon City (April, 2008)
c.) Certificate of Completion Building Wiring Installation and Maintenance
By:Meralco Foundation Institute, Ortigas Pasig City ( April 2003- May 2003)
d.) Certificate of Attendance:
- Developing Riser Diagrams for Tall Buildings
- Design of Storm Drainage System for Subdivision
- Sustainable & Green Plumbing Practices
- Refrigeration & Air-conditioning, Operation, Maintenance, Design Calculation, VRF system, Ventilation
- Instrumentation and Controls
- How to Design your Power Factor Capacitor Bank
- Basic Electrical Design and Computation
- STP Design, Operation and Maintenance
All Conducted By: MEPF Organization of the Philippines, Inc.
Steps for completing your project
After purchasing the project, send requirements so Joseph Jason can start the project.
Delivery time starts when Joseph Jason receives requirements from you.
Joseph Jason works on your project following the steps below.
Revisions may occur after the delivery date.
Discuss your requirements
Tell us your detail requirements like a.) How many sqm your plan residential or commercial area? b.) How many appliances do you plan to purchase or install? c) For Plumbing how many tiolet, urinals, sink,etc. your requirements