You will get fine engineering at work
Cris P.
You will get fine engineering at work
Cris P.
- Delivery Time 7 days
- Number of Revisions 1
- Number of 2D Drawings 2
- High Level of Details
- Graphic Enhancements
- Source Files
- Layout Sheets
7 days
delivery —
Oct 23, 2024
Revisions may occur after this date.
Upwork Payment Protection
Fund the project upfront. Cris gets paid once you are satisfied with the work.
Project details
“I’ve had 27 years of experience working on similar projects, so I know what problems are going to arise and can prevent them from happening — saving the team time and energy to work on higher-value tasks.
My previous experiences have shown me the ability to control a project and make sure the team delivers tasks on time and within budget.
My previous experiences have shown me the ability to control a project and make sure the team delivers tasks on time and within budget.
Project Scale
BuildingBuilding Type
ResidentialFile Format
3DS, DWG, JPG, PDF$800
- Delivery Time 7 days
- Number of Revisions 1
- Number of 2D Drawings 2
- High Level of Details
- Graphic Enhancements
- Source Files
- Layout Sheets
Optional add-ons
You can add these on the next page.
Fast 3 Days Delivery
+$1,000
Additional Revision
+$100
Additional 2D Drawing
(+ 3 Days)
+$50About Cris
Engineering | Adobe Photoshop | Autodesk AutoCAD | 3D Rendering
Abu Dhabi, United Arab Emirates - 5:24 am local time
attention to detail while upholding a
heavy workload...a team player and a
consummate professional..."
Core Competencies:
- Drawing and Designs
- Site execution & supervision of
large projects.
- Project management.
- Capable of providing technical
leadership in a multi-disciplinary
construction environment.
- Tendering & project costing.
- Preparation & monitoring of
work schedules.
- Project accounting & cash flow
statements.
- Co-ordination with electromechanical
works.
- Ability to work with a diverse,
multi-cultural workforce.
- Cost control & scheduling.
- Knowledge of designing of road
works & RCC structures.
- Quality Control / Quality
Assurance procedures.
- Health, Safety and Environmental
procedures.
More than twenty-seven(27) years of meaningful experience in vertical and horizontal construction, more than twenty(23) years of which are in Gulf Countries(overseas). Proficient in the execution of QA/QC Management, Drawing and Design, Planning and Construction Operations. Licensed Civil Engineer with a passing grade of 84.10% in the Civil Engineering Licensure Board Examination(PRC). Dynamic leader, hardworking, organized and flexible to adapt to any kind or workforce and environment.
- A licensed of Civil Engineer,
well versed in project
management, site execution,
quality control procedures,
safety procedures, cost control
and estimation works.
- Expertise in handling high-rise
buildings, horizontal
constructions, quality assurance
and quality procedure,
estimation, and infrastructure
works., Skills and Expertise:
- Construction of multi-storied
buildings, roads, underpasses
and bridges, sub-station
buildings, industrial buildings,
architectural stadium covers,
and housing/villa projects.
- Road works, water supply
projects like reservoirs,
pipelines & pumping station,
surface drainage, sewerage.
- Infrastructure works including
landscaping, telephone, LV, MV
and repair works.
- With knowledge in AutoCAD,
Primavera and various
programs and Microsoft
Applications.
- Profound knowledge in quality
control/quality assurance,
estimation works and cost
analysis.
- Excellent communication in
English(verbal and writing).
Steps for completing your project
After purchasing the project, send requirements so Cris can start the project.
Delivery time starts when Cris receives requirements from you.
Cris works on your project following the steps below.
Revisions may occur after the delivery date.
Know what the client wants.
Understanding their needs. Understanding what prospects need, discovering what they want, and helping them know the difficulties during the project.
Know their business.
Build rapport with your clients, know the priorities in the project,