You will get Fully Coordinated Revit Model
Top Rated Plus

Let a pro handle the details
Buy 3D BIM Modeling services from Ahmed Mahmoud Fadel, priced and ready to go.
See how it works
You will get Fully Coordinated Revit Model
Top Rated Plus
- Delivery Time 2 days
- Number of Revisions 3
- Number of 2D Drawings 5
- Level of Detail 3
- Number of Renderings 0
- Native BIM Source Files
- Model Audit & Verification
2 days
delivery —
Dec 11, 2023
Revisions may occur after this date.
Upwork Payment Protection
Fund the project upfront. Ahmed Mahmoud Fadel gets paid once you are satisfied with the work.

Let a pro handle the details
Buy 3D BIM Modeling services from Ahmed Mahmoud Fadel, priced and ready to go.
See how it works
Project details
You will get a fully coordinated Revit model with all construction drawings accurate and neat , with all the revisions till you get the best result.
The start pricing for every 200 square meter.
The start pricing for every 200 square meter.
Field of Expertise
Architectural
Building Type
Residential
BIM Software
Autodesk Revit
File Format
RVT, RFA, DWG, RTE
What's includedService Tiers
Starter
$100
Standard
$250
Advanced
$500
Delivery Time
2 days
5 days
10 days
Number of Revisions
3
7
Unlimited
Number of 2D Drawings
5
9
15
Level of Detail
3
5
7
Number of Renderings
0
1
3
Design Analysis
-
Architectural Walkthrough
-
-
Native BIM Source Files
Model Audit & Verification
Optional add-ons
You can add these on the next page.
Fast Delivery
+$20 - $100About Ahmed Mahmoud Fadel
Revit, BIM Specialist
Revit, BIM Specialist
100%
Job Success
Aswan, Egypt
- 8:18 pm local time
I'm a structural engineer with more than 12 years of experience in construction field
I'm now work mainly in Revit modeling, (from point cloud, pdf, dwg, skp and hand drawing), parametric and family creation
I've extensive experience in modeling all disciplines ( Arch,Struc and MEP) in Revit
Preparing construction drawings and permit drawings
Steps for completing your project
After purchasing the project, send requirements so Ahmed Mahmoud Fadel can start the project.
Delivery time starts when Ahmed Mahmoud Fadel receives requirements from you.
Ahmed Mahmoud Fadel works on your project following the steps below.
Revisions may occur after the delivery date.
Receive the required drawings
Attach the drawings that you need to be converted to a Revit model