You will get G.A Drawing and Schematic Diagram for the Electrical Control Wiring

Javed B.
Javed B.

Let a pro handle the details

Buy 2D Product Drawing services from Javed, priced and ready to go.

You will get G.A Drawing and Schematic Diagram for the Electrical Control Wiring

Javed B.
Javed B.

Select service tier

General Arrangement Drawings

Low Voltage Panel Drawing.

  • Delivery Time 3 days
  • Number of Revisions 1
  • Number of Drawings 1
3 days delivery — Nov 12, 2024
Revisions may occur after this date.
Upwork Payment Protection
Fund the project upfront. Javed gets paid once you are satisfied with the work.

Let a pro handle the details

Buy 2D Product Drawing services from Javed, priced and ready to go.

Project details

EXCELLENT SERVICES TO OUR CLIENT :

If you have an Electrical Project and you need to draw its wiring and design it. please send it to us.
Materials
Other
Field of Expertise
Lighting, Machinery
Design Software
AutoCAD, Other
File Format
DWG, PDF, Other
What's included
Service Tiers Starter
$15
Standard
$45
Advanced
$65
Delivery Time 3 days 4 days 7 days
Number of Revisions
123
Number of Drawings
123
Unlimited Drawings
-
-
-
Patent Drawing
-
-
-
Source Files
-
-
-
Javed B.

About Javed

Javed B.
Electrical Control Panel, Substation Layout, Wiring, SLD, BOQ & Design
Lahore, Pakistan - 2:41 pm local time
We will prepare an General Arrangement drawing, Electrical Single Line Diagram, Control Wiring and Schematic diagram for any type of the panels i.e.;
Low Voltage Switchgear.
ATS/AMF Panel.
ATS/AMF Panel with Manual override.
Manual Changeover Switch.
Power factor Correction Panel.
Bus Tie Duct.
Power/Light Distribution Boards.
Street Light Control Panel.
MCC Control Panel (Star/Delta/Rev./For. Starters).
Control Panel Design.
Sub-station Layout.
& Control Circuit Diagram for ACCESS CONTROL SYSTEM.

Steps for completing your project

After purchasing the project, send requirements so Javed can start the project.

Delivery time starts when Javed receives requirements from you.

Javed works on your project following the steps below.

Revisions may occur after the delivery date.

Drafting

to help us to make a control circuit or schematic diagram.

Review the work, release payment, and leave feedback to Javed.