You will get G.A Drawing and Schematic Diagram for the Electrical Control Wiring
Javed B.
You will get G.A Drawing and Schematic Diagram for the Electrical Control Wiring
Javed B.
General Arrangement Drawings
Low Voltage Panel Drawing.
- Delivery Time 3 days
- Number of Revisions 1
- Number of Drawings 1
3 days
delivery —
Nov 12, 2024
Revisions may occur after this date.
Upwork Payment Protection
Fund the project upfront. Javed gets paid once you are satisfied with the work.
Project details
EXCELLENT SERVICES TO OUR CLIENT :
If you have an Electrical Project and you need to draw its wiring and design it. please send it to us.
If you have an Electrical Project and you need to draw its wiring and design it. please send it to us.
Materials
OtherField of Expertise
Lighting, MachineryDesign Software
AutoCAD, OtherFile Format
DWG, PDF, OtherWhat's included
Service Tiers |
Starter
$15
|
Standard
$45
|
Advanced
$65
|
---|---|---|---|
Delivery Time | 3 days | 4 days | 7 days |
Number of Revisions | 1 | 2 | 3 |
Number of Drawings | 1 | 2 | 3 |
Unlimited Drawings | - | - | - |
Patent Drawing | - | - | - |
Source Files | - | - | - |
About Javed
Electrical Control Panel, Substation Layout, Wiring, SLD, BOQ & Design
Lahore, Pakistan - 2:41 pm local time
Low Voltage Switchgear.
ATS/AMF Panel.
ATS/AMF Panel with Manual override.
Manual Changeover Switch.
Power factor Correction Panel.
Bus Tie Duct.
Power/Light Distribution Boards.
Street Light Control Panel.
MCC Control Panel (Star/Delta/Rev./For. Starters).
Control Panel Design.
Sub-station Layout.
& Control Circuit Diagram for ACCESS CONTROL SYSTEM.
Steps for completing your project
After purchasing the project, send requirements so Javed can start the project.
Delivery time starts when Javed receives requirements from you.
Javed works on your project following the steps below.
Revisions may occur after the delivery date.
Drafting
to help us to make a control circuit or schematic diagram.