You will get G.A Drawing and Schematic Diagram for the Electrical Control Wiring

Let a pro handle the details
Buy 2D Product Drawing services from Javed, priced and ready to go.
See how it works
You will get G.A Drawing and Schematic Diagram for the Electrical Control Wiring
General Arrangement Drawings
Low Voltage Panel Drawing.
- Delivery Time 3 days
- Number of Revisions 1
- Number of Drawings 1
3 days
delivery —
Dec 2, 2023
Revisions may occur after this date.
Upwork Payment Protection
Fund the project upfront. Javed gets paid once you are satisfied with the work.

Let a pro handle the details
Buy 2D Product Drawing services from Javed, priced and ready to go.
See how it works
Project details
EXCELLENT SERVICES TO OUR CLIENT :
If you have an Electrical Project and you need to draw its wiring and design it. please send it to us.
If you have an Electrical Project and you need to draw its wiring and design it. please send it to us.
Materials
Other
Field of Expertise
Lighting, Machinery
Design Software
AutoCAD, Other
File Format
DWG, PDF, Other
What's includedService Tiers
Starter
$15
Standard
$45
Advanced
$65
Delivery Time
3 days
4 days
7 days
Number of Revisions
1
2
3
Number of Drawings
1
2
3
Unlimited Drawings
-
-
-
Patent Drawing
-
-
-
Source Files
-
-
-
About Javed
I will do control wiring & schematic for industrial control panel.
I will do control wiring & schematic for industrial control panel.
Lahore, Pakistan
- 4:22 pm local time
GENERAL ARRANGEMENT DRAWINGS & WIRING DIAGRAM FOR ALL TYPES OF LV PANELS:
Low Voltage Switchgear.
ATS/AMF Panel.
ATS/AMF Panel with Manual override.
Manual Changeover Switch.
Power factor Correction Panel.
Bus Tie Duct.
Power/Light Distribution Boards.
Street Light Control Panel.
MCC Control Panel (Star/Delta/Rev.For. Starters).
Sub-station Layout
& Control Circuit Diagram for ACCESS CONTROL SYSTEM.
Steps for completing your project
After purchasing the project, send requirements so Javed can start the project.
Delivery time starts when Javed receives requirements from you.
Javed works on your project following the steps below.
Revisions may occur after the delivery date.
Drafting
to help us to make a control circuit or schematic diagram.