You will get Insulation Takeoff for Residential/Multi-family/Commercial Project
Top Rated
You will get Insulation Takeoff for Residential/Multi-family/Commercial Project
Project details
You will get an Insulation Takeoff, Waterproofing Takeoff in DIV-7 (Thermal & Moisture Protection) for all types of Structures.
Project Scale
ApartmentBuilding Type
Commercial, Institutional & Public, ResidentialFile Format
PDFWhat's included
Service Tiers |
Starter
$140
|
Standard
$250
|
Advanced
$450
|
---|---|---|---|
Delivery Time | 2 days | 3 days | 5 days |
Number of Revisions | 0 | 0 | 0 |
High Level of Details | |||
Graphic Enhancements | |||
Source Files | |||
Layout Sheets | - | - | - |
46 reviews
(45)
(1)
(0)
(0)
(0)
This project doesn't have any reviews.
CR
Christopher R.
Oct 11, 2024
Div 02 Takeoffs on PlanSwift
Great estimator & very accurate performing material takeoffs. We highly recommend Sohaib!
CR
Christopher R.
Oct 11, 2024
Interior Demolition Material Takeoff Estimator
Great estimator & very accurate performing material takeoffs. We highly recommend Sohaib!
CR
Christopher R.
Oct 11, 2024
Material Takeoffs for Demolition
Great estimator & very accurate performing material takeoffs. We highly recommend Sohaib!
CR
Christopher R.
Oct 11, 2024
Projects Estimation
Great estimator & very accurate performing material takeoffs. We highly recommend Sohaib!
RC
Robert C.
Sep 17, 2024
Chino assisted living facility
About Sohaib
Takeoff Expert || Quantity & Material Takeoffs || Cost Estimator
100%
Job Success
Lahore, Pakistan - 9:03 am local time
Using this platform, I want to serve my clients in QUANTITY TAKEOFFS, MATERIAL TAKEOFFS & COST ESTIMATION PROJECTS according to their requirements. I'll cover and provide my services in the following trades:
Div. 01 — General Conditions
Div. 02 — Existing Conditions
Div. 03 — Concrete (e.g., footings, slabs)
Div. 04 — Masonry (CMU block, brick, stone)
Div. 05 — Metals
Div. 06 — Wood, Plastics & Composites
Div. 07 — Thermal & Moisture Protection
Div. 08 — Openings (Doors, windows, skylights etc.)
Div. 09 — Finishes
Div. 10 — Specialties
Div. 11 — Equipments
Div. 12 — Furnishings
Div. 13 — Special Construction
Div. 14 — Conveying Equipments
Div. 22 — Plumbing
Div. 23 — HVAC
Div. 26 — Electrical
Div. 31 — Earthwork
Div. 32 — Exterior Improvements
Why me...?
1. Get Instant replies mostly within 0-15 minutes.
2. Get Detailed estimates for projects of all types ( Specific division, Residential building, Apartment, Commercial Building).
3. Get your delivery on time.
Steps for completing your project
After purchasing the project, send requirements so Sohaib can start the project.
Delivery time starts when Sohaib receives requirements from you.
Sohaib works on your project following the steps below.
Revisions may occur after the delivery date.
Takeoff
Completion of Takeoff and delivering it to client