You will get Material Takeoff & Construction Estimate (All CSI Divisions)

Fiaz A.
Fiaz A. Fiaz A.
5.0
Top Rated

Let a pro handle the details

Buy 2D Architectural Drawings & Floor Plans services from Fiaz, priced and ready to go.

You will get Material Takeoff & Construction Estimate (All CSI Divisions)

Fiaz A.
Fiaz A. Fiaz A.
5.0
Top Rated

Select service tier

Single Trade Takeoff

will Cover any one specific trade like concrete, masonry, finishes etc

  • Delivery Time 1 day
  • Number of Revisions 2
  • Number of 2D Drawings 30
1 day delivery — Oct 11, 2024
Revisions may occur after this date.
Upwork Payment Protection
Fund the project upfront. Fiaz gets paid once you are satisfied with the work.

Let a pro handle the details

Buy 2D Architectural Drawings & Floor Plans services from Fiaz, priced and ready to go.

Project details

You will get detailed Material/Quantity takeoff as per CSI Divisions Breakdown, if you have your own customized Excel template then will work accordingly.
Project Scale
Building
Building Type
Commercial, Office & Work Space, Residential
File Format
3DS, DWG, PDF
What's included
Service Tiers Starter
$100
Standard
$200
Advanced
$500
Delivery Time 1 day 2 days 3 days
Number of Revisions
222
Number of 2D Drawings
3050100
High Level of Details
-
-
-
Graphic Enhancements
-
-
-
Source Files
-
-
-
Layout Sheets
-
-
-
Optional add-ons You can add these on the next page.
Fast Delivery
+$50
5.0
20 reviews
95% Complete
5% Complete
1% Complete
(0)
1% Complete
(0)
1% Complete
(0)
Rating breakdown
Availability
5.0
Deadlines
5.0
Skills
4.9
Cooperation
5.0
Quality
4.9
Communication
5.0

TC

Tobias C.
5.00
Sep 16, 2024
Gympie stormwater take off

PF

Paymon F.
5.00
Sep 15, 2024
Venice Restaurant Construction Take-off

TD

Toby D.
5.00
Apr 7, 2024
Roofing and Cladding Estimation Fiaz was fantastic and helped us out with our task we needed fulfilled. Couldn’t fault anything. Thank you Fiaz, we will certainly be returning clients!

CB

Cory B.
5.00
Feb 26, 2024
Concrete Takeoffs

CB

Cory B.
5.00
Jul 31, 2023
Estimator Overall, I am appreciative of the effort and attention to detail demonstrated in the estimation process. Your expertise and knowledge in the field are evident, and I acknowledge the accuracy of the estimates given.

Your skills and proficiency in concrete estimation are commendable, and I believe with some adjustments, your services can become even more valuable.
Fiaz A.

About Fiaz

Fiaz A.
Material Takeoff, Construction Estimator (All CSI Divisions)
100% Job Success
5.0  (20 reviews)
Kasur, Pakistan - 4:21 am local time
I am a Civil Engineer with over 6 years of experience in Construction Estimation.
I'm an Expert in Materials/Quantity Takeoff using Bluebeam and Planswift Software.
I have completed a lot of projects for every trade of Construction (Site Work, Architecture, Structure, MEP)(All CSI Divisions).
— Concrete, Reinforcement, Formwork Takeoffs
— Masonry, Brick & Blockwork
— Drywall, Ceiling, Partition Wall
— Floor Finishes, Tiling & Stone Finishes
— Painting, Rendering, Cladding
— Doors and Windows, Glazing
— Carpentry and Timber
— Roofing, Decking, Thermal, and Moisture Protection
— Toilet and Bath Accessories
— Structural metals Estimation
— Mechanical/Plumbing
— Electrical Takeoffs

I've worked on New Construction and renovation for Residential and Commercial Projects.
I have a lot of takeoffs that I have done already and can provide as sample work

I look forward to hearing from you about how we can work together.

Steps for completing your project

After purchasing the project, send requirements so Fiaz can start the project.

Delivery time starts when Fiaz receives requirements from you.

Fiaz works on your project following the steps below.

Revisions may occur after the delivery date.

RFI

if there will be any deficiencies or details missing in the drawings then I have to get details before completing project

Review the work, release payment, and leave feedback to Fiaz.