You will get material-Takeoff, estimation for Concrete Drywall Electrical HVAC Plumbing

4.0

Let a pro handle the details

Buy Other Building Information Modeling services from Muhammad, priced and ready to go.

You will get material-Takeoff, estimation for Concrete Drywall Electrical HVAC Plumbing

4.0

What's included $60

Construction cost Estimation

Construction Quantity Takeoffs for Concrete Drywall Electrical HVAC Plumbing

  • Delivery Time 1 day
  • Number of Revisions 1
1 day delivery — Oct 5, 2024
Revisions may occur after this date.
Upwork Payment Protection
Fund the project upfront. Muhammad gets paid once you are satisfied with the work.

Let a pro handle the details

Buy Other Building Information Modeling services from Muhammad, priced and ready to go.

Project details

Hey there,



ARE YOU LOOKING FOR MATERIAL TAKEOFF AND COST ESTIMATION FOR RESIDENTIAL OR COMMERCIAL BUILDINGS ON PLANSWIFT OR BLUEBEAM?



My name is Engr. Waqar Manzoor and I am a professional certified estimator. I made approximated the number of projects from clients in countries such as USA, UK, Canada and Australia as well.



I've experience in all of the CSI divisions.



My services include the following:



Concrete
Drywall
Electrical
HVAC
Plumbing
framing
flooring
Sitework
Masonry
Painting
Earthwork
Roofing
Siding
Flooring
Metals for carpentry
Steel
Demolition
Equipment in General
Special Construction
Furnishings
Transporting Systems
Mechanical
MEP




Why you chose me for material take off and cost estimation?



Professional reporting, as well as exact quantity or material takeoff
Final Bill of Quantity (BOF) in the form of an Excel spreadsheet
Pricing or costing of material Based on RS Mean
Accurate cost estimation, construction takeoff estimation, and material takeoff estimation will help you could win more bids


Best regards,
Muhammad Rizwan
Field of Expertise
Mechanical, Electrical, & Plumbing
Building Type
Residential
BIM Software
Autodesk AutoCAD, Bluebeam Revu
What's included $60 These options are included with the project scope.
$60
  • Delivery Time 1 day
  • Number of Revisions 1
4.0
3 reviews
67% Complete
1% Complete
(0)
1% Complete
(0)
33% Complete
1% Complete
(0)
Rating breakdown
Availability
4.0
Deadlines
4.0
Skills
4.0
Quality
4.0
Cooperation
4.0
Communication
4.0

DG

Design G.
5.00
Mar 3, 2023
I need a help in pricing of my plan of demolition project Muhammad Rizwan's services are very helpful and his cost estimation is spot on!

AD

Amara D.
5.00
Sep 26, 2022
YoloV5 Object detection I am delighted and very satisfied with the quality of work from Rizwan, he is also very fast, and highly recommend him to anyone out there!

IS

Illya S.
2.00
Aug 3, 2021
Need Communication Electronic Expert, please bid $40 He tried his best, but did only 28% of the work we agreed to, so only 2 stars.
Muhammad R.

About Muhammad

Muhammad R.
Construction Cost Estimate I Quantity Surveyor l Material Takeoff |MEP
4.0  (3 reviews)
Dunyapur, Pakistan - 11:27 pm local time
I am a Civil engineer with (6+) years of experience in Material Take-offs, Cost Estimation, and Bid Preparation for Residential, commercial and industrial buildings. I have worked for a variety of subcontractors, main contractors, and general builders.
I have estimated the number of projects of clients from the USA, UK, and Australia on Fiverr and other platforms.

I have experience working in every division of CSI:

MY SERVICES:

I will provide material takeoff for:

Walls (Wood Studs or Metal Studs)
Openings (Doors, Windows, Skylight, Storefront, Curtains, Hardware)
Finishes (Floor & Wall Finishes,Trims)
Specialties (Hand Dryer, Grab bars, soap dispenser, Railings)
Equipment (Kitchen or Laundry)
Furnishes (Countertop etc.)
Site Work, Demolition, Landscaping, Soil Erosion & Control
Concrete Work (Foundation, Footing, Slabs)
Masonry Work (CMU Wall, Brick Veneer)
Metals (Metal Deck, Steel Beams etc.)
Wood, Plastic Composite (Joist, Beams, Lumber Work)
Roofing & Insulations
Fire Protection (Sprinkler, Piping)
HVAC (Ducts, Diffusers RTU Units)
Plumbing (Piping & Fixtures)
Electrical (Lighting Fixtures & Devices)


Why should you choose me for Cost Estimation and Material takeoff?

Accurate quantity takeoff or material takeoff and Professional Reporting Form
Final BOQ in form of Excel Sheet.
Cost/Pricing Services, based on RS Mean.

Regards,
Muhammad Rizwan

Steps for completing your project

After purchasing the project, send requirements so Muhammad can start the project.

Delivery time starts when Muhammad receives requirements from you.

Muhammad works on your project following the steps below.

Revisions may occur after the delivery date.

How final is the delivery?

You will get Professional reporting, as well as exact quantity or material takeoff Final Bill of Quantity (BOF) in the form of an Excel spreadsheet

Review the work, release payment, and leave feedback to Muhammad.