You will get material takeoffs and bill of quantities
ISAAC K.
You will get material takeoffs and bill of quantities
ISAAC K.
Project details
I do material takeoffs and bill of quantities used in tendering in the construction industry in which materials, parts, and labor are itemized. The document details the terms and conditions of the construction or repair contract and itemizes all work to enable a contractor to price the work for which he or she is bidding. Send me a message to get the bill of quantities of your project. I assure you the best.
Project Scale
BuildingBuilding Type
Commercial, Institutional & Public, ResidentialFile Format
JPG, PDFWhat's included
Service Tiers |
Starter
$60
|
Standard
$110
|
Advanced
$170
|
---|---|---|---|
Delivery Time | 5 days | 10 days | 15 days |
Number of Revisions | 3 | 5 | 7 |
3D Modeling | - | - | - |
Mood Board & Inspiration | |||
Source Files | |||
High Level of Details |
About ISAAC
Expert in Architectural and Structural design
Ado-Ekiti, Nigeria - 11:26 am local time
-I will design reinforced concrete (RC), Steel, and timber structures.
-I will do 2D and 3D floor plan design to your taste.
-I will also do other Civil Engineering designs such as roads, culverts and bridge designs.
-I do takeoffs and estimations.
See the list of my design software
Orion: Reinforced concrete design software
Risa3D: Steel and timber design software
AutoCAD: drafting software
Revit: Building model software
Solidworks: Machine models and design software
Civil 3D: Road design and analysis software
Primavera: Estimation/Bill of quantities software
Vip3D: 3D pool and landscape
Steps for completing your project
After purchasing the project, send requirements so ISAAC can start the project.
Delivery time starts when ISAAC receives requirements from you.
ISAAC works on your project following the steps below.
Revisions may occur after the delivery date.
Try to contact me and discuss the scope of your work