You will get professional steel structure design and detailing works with in 24 hours.

You will get professional steel structure design and detailing works with in 24 hours.

Project details
I have attached two small example projects for you. it's look very simple but it was challenging project of my carrier. One is the oil refine plant building and another is the gangway baily bridge.
Project Scale
BuildingBuilding Type
Commercial, Industrial, Institutional & PublicFile Format
3DS, DWG, JPG, OBJ, PDF, RVT, SKPWhat's included
Service Tiers |
Starter
$20
|
Standard
$170
|
Advanced
$200
|
---|---|---|---|
Delivery Time | 2 days | 7 days | 5 days |
Number of Revisions | 1 | 1 | 3 |
Number of 2D Drawings | 50 | 70 | |
High Level of Details | - | - | |
Graphic Enhancements | - | - | |
Source Files | - | - | |
Layout Sheets | - |
Frequently asked questions
About Rok
Professional Steel Structure Detailer & Checker
Ishurdi, Bangladesh - 1:47 am local time
and very familiar with US, Canada, UK and Australian standard.
##Service Description:
#Education Qualification: (Diploma-in-Eng.) and (BSc-in-Eng.) in Civil Engineering.
#JOB with global company: 25++ international companies.
#Familiar with standard:*(US)>AISC,AWE *(Canada) *(UK) *(India) *(Australian) standard.
#Using software:
@ Model & Detailing : *(AutoCAD) *(TEKLA STRUCTURES) *(Advance steel).
@ Architecture and visualization :*(SketchUp) *(V-ray) *(Lumion) *(3d max).
@ Estimating and costing : *(Microsoft Excel) *(Bluebeam Revu)
#My Duties: *(Project Realistic 3D view)
*(proposal drawing): *Master Plan, all Elevations.
*(approval drawing): *Same of erection/site working drawing *Structure Detail
*Trim Detail.
*(fabrication/shop drawing):***Plasma cut Layout of all plates*** , Assembly
drawing , single part drawing, loose part drawing ,welding note,
*(erection/site working drawing): Site working drawing *Structure Detail *Trim
Detail.
*(Bill of Materials):All materials Weight, Painting Area, RFI, costing.
#Life time Contact services: With my all Clients during problems my drawing
understanding and revision.
#Contact with me: 24/7 hours by massage/email/any type of legal virtual contact any
time.
#I am committed to quality service as well as the deadline in the project.
"Please contact me and ask more, I am very willing to talk to you."
thank you so much.
Steps for completing your project
After purchasing the project, send requirements so Rok can start the project.
Delivery time starts when Rok receives requirements from you.
Rok works on your project following the steps below.
Revisions may occur after the delivery date.
Gather requirements
At 1st i was collected all design data and Architectural drawings, site measurements.
Master Studies
Master Studies mean i have to understood that, when i get all design data ,Architectural drawings & site measurements. Then i started to found out point to point all detailing errors which will be break down my detailing Schedules.