You will get Professional steel structure workshop drawings

YU  W.
YU W.

Let a pro handle the details

Buy Other Building Information Modeling services from YU , priced and ready to go.

You will get Professional steel structure workshop drawings

YU  W.
YU W.

What's included $600

Advanced

Manufacturing drawings, including assembly drawings. in PDF and DWG format.

  • Delivery Time 7 days
  • Number of Revisions 9
7 days delivery — Nov 11, 2024
Revisions may occur after this date.
Upwork Payment Protection
Fund the project upfront. YU gets paid once you are satisfied with the work.

Let a pro handle the details

Buy Other Building Information Modeling services from YU , priced and ready to go.

Project details

I offer you a great steel detailing service, deliverables are:
1- Tekla structures 3d model
2- Fabrication drawings including assembly, single part drawings. Both PDF and DWG formats.
3- CNC files and DXF files.
4- General arrangement drawings.
5- Reports (Assembly list, part list, bolt list and material list)
6- IFC files.
Field of Expertise
Architectural
Building Type
Commercial
BIM Software
Autodesk Revit, Dynamo Studio, Autodesk Civil 3D
File Format
RVT, RFA, DWG, RTE, NWD
What's included $600 These options are included with the project scope.
$600
  • Delivery Time 7 days
  • Number of Revisions 9
YU  W.

About YU

YU  W.
You will get Steel structure shop drawings on Tekla Structures
Winter Park, United States - 1:11 am local time
I offer you a great steel detailing service, deliverables are:
1- Tekla structures 3d model
2- Fabrication drawings including assembly, single part drawings. Both PDF and DWG formats.
3- CNC files and DXF files.
4- General arrangement drawings.
5- Reports (Assembly list, part list, bolt list and material list)
6- IFC files.

Steps for completing your project

After purchasing the project, send requirements so YU can start the project.

Delivery time starts when YU receives requirements from you.

YU works on your project following the steps below.

Revisions may occur after the delivery date.

Get requirements

Buyer sends the requirements to get started with

Review the work, release payment, and leave feedback to YU .