You will get Quantity survey and cost for your construction project
Muzamil K.
You will get Quantity survey and cost for your construction project
Muzamil K.
- Delivery Time 5 days
- Number of Revisions 1
5 days
delivery —
Oct 8, 2024
Revisions may occur after this date.
Upwork Payment Protection
Fund the project upfront. Muzamil gets paid once you are satisfied with the work.
Project details
Cost Estimation/Civil Estimation/Estimation services/Construction cost/construction estimation
Welcome respected Client!
Are you looking for cost estimation for your next project?
We provide best estimation services throughout New York
I offer detailed and itemized material take-offs and reliable cost estimates for all construction trades of architectural, structural, and MEP.
Following is the non-exhaustive list of my domains of expertise:
New construction and renovation of residential, commercial and industrial projects.
Complete Electrical, HVAC and Plumbing scope.
Structural steel, Lumber and Metal stud framing.
Demolition, Masonry, Concrete and Rebar (including bar bending schedule and formwork).
Interior and exterior finishes including drywall.
Thermal including all types of insulations, roofing and siding.
Earthwork including excavation, grading and underpinning etc.
Our estimates comprised of
Complete breakdown so that you can order material.
ALL CSI WORK
100% quantities.
99% Accuracy.
In-time completion
Extra feature of costing
Cost Estimation/Civil Estimation/Estimation services/Construction cost/construction estimation
Welcome respected Client!
Are you looking for cost estimation for your next project?
We provide best estimation services throughout New York
I offer detailed and itemized material take-offs and reliable cost estimates for all construction trades of architectural, structural, and MEP.
Following is the non-exhaustive list of my domains of expertise:
New construction and renovation of residential, commercial and industrial projects.
Complete Electrical, HVAC and Plumbing scope.
Structural steel, Lumber and Metal stud framing.
Demolition, Masonry, Concrete and Rebar (including bar bending schedule and formwork).
Interior and exterior finishes including drywall.
Thermal including all types of insulations, roofing and siding.
Earthwork including excavation, grading and underpinning etc.
Our estimates comprised of
Complete breakdown so that you can order material.
ALL CSI WORK
100% quantities.
99% Accuracy.
In-time completion
Extra feature of costing
Cost Estimation/Civil Estimation/Estimation services/Construction cost/construction estimation
Project Scale
BuildingBuilding Type
Commercial, Office & Work Space, ResidentialWhat's included
Service Tiers |
Starter
$15
|
Standard
$30
|
Advanced
$60
|
---|---|---|---|
Delivery Time | 5 days | 4 days | 3 days |
Number of Revisions | 1 | 1 | 1 |
Background/Scene | - | - | - |
Architectural Walkthrough | - | - | - |
High Level of Details | - | - | - |
Source Files | - | - | - |
About Muzamil
Construction cost estimation and quantity takeoff consultant
Lahore, Pakistan - 1:27 am local time
Are you a contractor who’s tired of losing out on profitable jobs due to inaccurate estimates? One of my clients lost $100K because of a simple assembly error made by their previous estimator. That’s why accuracy is crucial—and why it pays to invest in expert estimating services.
With a Bachelor’s degree in Civil Engineering and over five years of experience in the estimating field, I’ve worked as the head estimator for multiple companies, delivering precise and reliable take-offs and quantity estimates for residential and commercial projects. From Earthworks to Roofing and everything in between, I’ve handled projects across all CSI divisions, primarily focused on U.S.-based estimation.
I specialize in Planswift, RS MEANS, and MS Excel, ensuring you receive detailed, accurate estimates tailored to your requirements. Whether you need estimates for excavation, masonry, structural steel, or tiling, I’m ready to help you turn bids into profitable wins.
Here is list of services I offer for
1) Quantity surveying
2) Cost Estimation
3) Bill of Quantities
4) Material takeoff
5) Preliminary estimate
Here are the details of type of works
General Requirements Estimation: Site work coordination, temporary facilities, construction waste management.
Existing Conditions Estimation: Site demolition, excavation, remediation, surveying.
Concrete Estimation: Formwork, reinforcement, cast-in-place concrete, precast concrete.
Masonry Estimation: Brick, block, stone masonry, precast concrete units, masonry restoration.
Metals Estimation: Structural steel framing, joists, metal decking, ornamental metalwork.
Wood, Plastics, Composites Estimation: Rough carpentry, finish carpentry, architectural woodwork.
Thermal and Moisture Protection Estimation: Waterproofing, insulation, roofing systems, fireproofing.
Openings Estimation: Doors, frames, windows, glazing, hardware installation.
Finishes Estimation: Gypsum board, plaster, tiling, flooring, acoustic ceilings, painting.
Specialties Estimation: Visual displays, signage, toilet partitions, storage systems.
Equipment Estimation: Loading dock equipment, kitchen equipment, security systems.
Furnishings Estimation: Casework, window treatments, seating, interior plants.
Special Construction Estimation: Pre-engineered structures, clean rooms, sound protection.
Fire Suppression Estimation: Fire sprinklers, fire pumps, standpipes, special hazard systems.
Plumbing Estimation: Water supply, sanitary drainage, plumbing fixtures, storm water systems.
HVAC Estimation: Ductwork, air handling units, HVAC controls, hydronic piping.
Integrated Automation Estimation: Building management systems, energy monitoring, control systems.
Electrical Estimation: Power distribution, lighting, transformers, emergency power, wiring.
Electronic Safety and Security Estimation: CCTV, access control, intrusion detection, fire alarms.
Earthwork Estimation: Site clearing, grading, excavation, shoring, dewatering.
Exterior Improvements Estimation: Paving, curbs, sidewalks, landscaping, irrigation, fencing.
Utilities Estimation: Water utilities, sanitary sewer, storm drainage, underground piping.
Transportation Estimation: Roadway construction, bridges, traffic signals, rail systems.
Who Can Benefit:
• Busy contractors who don’t have time for complex take-offs.
• Contractors looking to increase bidding opportunities and grow their business.
• Anyone who wants accurate estimates to reduce costly mistakes and maximize profit.
What I Need From You:
• PDF drawings and project specifications.
What you’ll get:
• Detailed take-off and quantity estimate in Excel format.
• Pricing for each line item as requested.
• Fast turnaround: 2-3 working days, depending on project complexity.
Drop a message and let's discuss your project.
Thanks for your time.
Steps for completing your project
After purchasing the project, send requirements so Muzamil can start the project.
Delivery time starts when Muzamil receives requirements from you.
Muzamil works on your project following the steps below.
Revisions may occur after the delivery date.
Final Remarks
I will confirm the scope of work and verify details.