You will get quantity takeoff, material take-off and construction cost estimation

You will get quantity takeoff, material take-off and construction cost estimation

Project details
I am a professional estimator. I have estimated the number of projects of clients from the USA, UK, and Australia.
I have experience working in every division of CSI:
MY SERVICES:
I will provide material takeoff for:
Walls (Wood Studs or Metal Studs)
Openings (Doors, Windows, Skylight, Storefront, Curtains, Hardware)
Finishes (Floor & Wall Finishes,Trims)
Specialties (Hand Dryer, Grab bars, soap dispenser, Railings)
Equipment (Kitchen or Laundry)
Furnishes (Countertop etc.)
Site Work, Demolition, Landscaping, Soil Erosion & Control
Concrete Work (Foundation, Footing, Slabs)
Masonry Work (CMU Wall, Brick Veneer)
Metals (Metal Deck, Steel Beams etc.)
Wood, Plastic Composite (Joist, Beams, Lumber Work)
Roofing & Insulations
Fire Protection (Sprinkler, Piping)
HVAC (Ducts, Diffusers RTU Units)
Plumbing (Piping & Fixtures)
Electrical (Lighting Fixtures & Devices)
Why should you choose me for Cost Estimation and Material takeoff?
Accurate quantity takeoff or material takeoff and Professional Reporting Form
Final BOQ in form of Excel Sheet.
Cost/Pricing Services, based on RS Mean.
Regards,
Muhammad Rizwan
I have experience working in every division of CSI:
MY SERVICES:
I will provide material takeoff for:
Walls (Wood Studs or Metal Studs)
Openings (Doors, Windows, Skylight, Storefront, Curtains, Hardware)
Finishes (Floor & Wall Finishes,Trims)
Specialties (Hand Dryer, Grab bars, soap dispenser, Railings)
Equipment (Kitchen or Laundry)
Furnishes (Countertop etc.)
Site Work, Demolition, Landscaping, Soil Erosion & Control
Concrete Work (Foundation, Footing, Slabs)
Masonry Work (CMU Wall, Brick Veneer)
Metals (Metal Deck, Steel Beams etc.)
Wood, Plastic Composite (Joist, Beams, Lumber Work)
Roofing & Insulations
Fire Protection (Sprinkler, Piping)
HVAC (Ducts, Diffusers RTU Units)
Plumbing (Piping & Fixtures)
Electrical (Lighting Fixtures & Devices)
Why should you choose me for Cost Estimation and Material takeoff?
Accurate quantity takeoff or material takeoff and Professional Reporting Form
Final BOQ in form of Excel Sheet.
Cost/Pricing Services, based on RS Mean.
Regards,
Muhammad Rizwan
Project Scale
BuildingBuilding Type
Industrial, Office & Work Space, ResidentialWhat's included
Service Tiers |
Starter
$40
|
Standard
$90
|
Advanced
$150
|
---|---|---|---|
Delivery Time | 1 day | 2 days | 3 days |
Number of Sq. Ft. | 500 | 1000 | 1500 |
Number of Revisions | 1 | 1 | 1 |
3D Modeling | - | - | - |
Mood Board & Inspiration | - | - | - |
Source Files | |||
High Level of Details | - | - | - |
About Muhammad
Construction Cost Estimate I Quantity Surveyor l Material Takeoff |MEP
Dunyapur, Pakistan - 7:46 am local time
I have estimated the number of projects of clients from the USA, UK, and Australia on Fiverr and other platforms.
I have experience working in every division of CSI:
MY SERVICES:
I will provide material takeoff for:
Walls (Wood Studs or Metal Studs)
Openings (Doors, Windows, Skylight, Storefront, Curtains, Hardware)
Finishes (Floor & Wall Finishes,Trims)
Specialties (Hand Dryer, Grab bars, soap dispenser, Railings)
Equipment (Kitchen or Laundry)
Furnishes (Countertop etc.)
Site Work, Demolition, Landscaping, Soil Erosion & Control
Concrete Work (Foundation, Footing, Slabs)
Masonry Work (CMU Wall, Brick Veneer)
Metals (Metal Deck, Steel Beams etc.)
Wood, Plastic Composite (Joist, Beams, Lumber Work)
Roofing & Insulations
Fire Protection (Sprinkler, Piping)
HVAC (Ducts, Diffusers RTU Units)
Plumbing (Piping & Fixtures)
Electrical (Lighting Fixtures & Devices)
Why should you choose me for Cost Estimation and Material takeoff?
Accurate quantity takeoff or material takeoff and Professional Reporting Form
Final BOQ in form of Excel Sheet.
Cost/Pricing Services, based on RS Mean.
Regards,
Muhammad Rizwan
Steps for completing your project
After purchasing the project, send requirements so Muhammad can start the project.
Delivery time starts when Muhammad receives requirements from you.
Muhammad works on your project following the steps below.
Revisions may occur after the delivery date.
Quality Control
Once your job is done, our quality Assurance team goes through the work done and finalizes yielding a high-quality result.