You will get quantity takeoff, material take off and cost estimation
Jawad D.
You will get quantity takeoff, material take off and cost estimation
Jawad D.
Project details
Being a professional Civil Engineer, I have been working as an estimator and quantity surveyor for years now. I have considerable experience in material take-off, cost estimation, and bidding for 100+ construction projects in different regions, such as the USA, UK, Canada, and Australia.
I have been using Planswift and MS Office for detailed cost estimation and bidding, for many builders and contractors. I can provide my services in material take-off, bidding preparation, pricing(RS Mean), and bill of quantities. I have worked in all 50 CSI trades, some of which include building estimates for Concrete, Masonry, Openings, Finishes, Electrical, and others.
Why should you choose me for Cost Estimation and Material take-off?
Accurate Quantity takeoff and Professional Reporting Formats
Cost/Pricing Services, based on RSMean.
You’ll receive professionally formatted Excel take-off sheets with all the items and Markup Drawings PDF, to cross-check all the work. All you have to provide are construction plans of the building/construction projects, to get accurate material take-offs.
Inbox for my sample work on previous material take-off projects.
Thanks,
Jawad Daud
I have been using Planswift and MS Office for detailed cost estimation and bidding, for many builders and contractors. I can provide my services in material take-off, bidding preparation, pricing(RS Mean), and bill of quantities. I have worked in all 50 CSI trades, some of which include building estimates for Concrete, Masonry, Openings, Finishes, Electrical, and others.
Why should you choose me for Cost Estimation and Material take-off?
Accurate Quantity takeoff and Professional Reporting Formats
Cost/Pricing Services, based on RSMean.
You’ll receive professionally formatted Excel take-off sheets with all the items and Markup Drawings PDF, to cross-check all the work. All you have to provide are construction plans of the building/construction projects, to get accurate material take-offs.
Inbox for my sample work on previous material take-off projects.
Thanks,
Jawad Daud
Project Scale
Building ComplexBuilding Type
Commercial, Institutional & Public, ResidentialFile Format
3DS, DWG, JPG, PDF, RVT, SKPWhat's included
Service Tiers |
Starter
$50
|
Standard
$100
|
Advanced
$150
|
---|---|---|---|
Delivery Time | 2 days | 4 days | 7 days |
Number of Sq. Ft. | 1000 | 2000 | 3000 |
Number of Revisions | Unlimited | Unlimited | Unlimited |
3D Modeling | - | - | - |
Mood Board & Inspiration | - | - | - |
Source Files | |||
High Level of Details |
About Jawad
Construction Cost Estimator | Material Takeoff | Plan Swift | RS Mean
Lahore, Pakistan - 8:23 am local time
Experience as a Quantity Estimator and completed projects worldwide. If you are looking for accurate work cost and material Estimation then this is the right platform for you. I will give you excellent quality with Accurate Estimates using Planswif/Bluebeam. I will be provided to you for all of your construction and biding requirements. My Take-off will help you to win more jobs and increase business wealth.
Areas of expert with using Panswift/Bluebeam;
In-depth detailed descriptions of each Item.
Include but are not limited to:
- Concreting & RebarTakeoff
- Masonry & Concrete Retaining Wall Takeoff
- Steam walls Takeoff
- Timber, Steel, Aluminum, Plywood, Fabric, and Plastic Takeoff
- Steel Structure PEB Building Takeoff,
- Ceilings, Drywall, Partition Takeoff, and Quantity Estimator
- Interior Exterior Painting work (Walls, Doors, Wall Covering, Balcon rail, Stair Rail, Fencing) Takeoff
- Flooring ( Tiling, wooden, Epoxy, and concrete floor) Takeoff
- Openings ( Doors, Windows, Hardware Tand Trims) Takeoff
- Roofing with all related Material Takeoff
If you have a question feel free to send a message.
Kind Regards,
Jawad Daud
Steps for completing your project
After purchasing the project, send requirements so Jawad can start the project.
Delivery time starts when Jawad receives requirements from you.
Jawad works on your project following the steps below.
Revisions may occur after the delivery date.
Acceptance
Client accepts the proposal and sends the required details I'll review the details i.e Drawings and Specs and let the client know if there is anything missing
Taking Off
I'll start taking off quantities and once finished I'll inform the client