You will get a Power BI OEE (Overall Equipment Effectiveness) Report

4.9

Let a pro handle the details

Buy Data Modeling services from Faruk, priced and ready to go.

You will get a Power BI OEE (Overall Equipment Effectiveness) Report

4.9

Let a pro handle the details

Buy Data Modeling services from Faruk, priced and ready to go.

Project details

This is a report designed with Power BI. You can reflect your OEE data on the screens with a beautiful design.

If you do not already have OEE calculation codes, please contact me.


What Is OEE (Overall Equipment Effectiveness)?
The simplest way to calculate OEE is as the ratio of Fully Productive Time to Planned Production Time. Fully Productive Time is just another way of saying manufacturing only Good Parts as fast as possible (Ideal Cycle Time) with no Stop Time. Hence the calculation is:

OEE = (Good Count × Ideal Cycle Time) / Planned Production Time

Although this is an entirely valid calculation of OEE, it does not provide information about the three loss-related factors: Availability, Performance, and Quality. For that – we use the preferred calculation.
Data Tool
Microsoft Power BI
What's included $350 These options are included with the project scope.
$350
  • Delivery Time 6 days
  • Number of Revisions 0
  • Number of Graphs/Charts 60
  • Number of Scenarios 1
  • Number of Model Variations 1

Frequently asked questions

4.9
9 reviews
89% Complete
11% Complete
1% Complete
(0)
1% Complete
(0)
1% Complete
(0)
Rating breakdown
Availability
4.9
Deadlines
4.8
Skills
4.9
Quality
4.9
Cooperation
4.9
Communication
4.9

AA

AbdulJalil A.
4.00
Sep 12, 2023
MS Dynamic 2009 Issue with SQL DB the task is done perfectly .. thanks Faruk

TD

Tomas D.
5.00
May 10, 2023
Axapta 2.5, Batch job not working properly. (worked fine for several years)

NS

Nasser S.
5.00
May 22, 2022
Employee Disclaimer in MS Dynamics AX 2012 Faruk do it...

AM

Ahamed M.
5.00
Dec 8, 2021
Modify the invoice of Microsoft Dynamics AX 2009 Faruk is by far one of the best freelancers I worked with on upwork. He's hardworking, competent in Microsoft AX 2009, communicates clearly, and is always available.
I have never heard him say: "this is not possible" which is something every employer desires

MW

Merelda W.
4.85
Jun 29, 2021
Developer needed to extract forms from AX Dynamics 2012 Faruk has been incredibly responsive and knowledgeable. We gave him our requirements and he was able to execute and more importantly, recommend a better way forward. We would recommend Faruk as a great, competent freelancer. In fact, we are starting a new contract with Faruk for the second phase of this project.
Faruk D.

About Faruk

Faruk D.
Microsoft Dynamics Ax / 365 F&O Technical Consultant
100% Job Success
4.9  (9 reviews)
Istanbul, Turkey - 8:57 am local time
● Over 14 years of Axapta 3.0 / Dynamics AX (4.0/ 2009 / 2012) / Dynamics 365 Finance and Operations experience (development and installation and configuration)
● Experience and knowledge of various tools:
○ Power BI
○ Microsoft Visual Studio (ASP .NET and C#)
○ SSRS
○ AIF
○ SQL Server
● Development and integration of Power BI reports into Dynamics AX
● Integration of third-party applications into Dynamics Ax
● Development of modules, forms, tables, classes
● Have worked for clients in USA, UK, Canada, Saudi Arabia, South Africa and Turkey
● Multiple certifications (ITIL, ASP .NET, MCPD)

Steps for completing your project

After purchasing the project, send requirements so Faruk can start the project.

Delivery time starts when Faruk receives requirements from you.

Faruk works on your project following the steps below.

Revisions may occur after the delivery date.

Gather Requirements

Requirement gathering of project & company

Project Outline

Based on discussion will finalize the requirement & contract so that both of us to be on same page

Review the work, release payment, and leave feedback to Faruk.