As-Built AutoCAD Drafting
Worldwide
We are seeking a skilled AutoCAD drafter to create as-built drawings for our construction projects. The ideal candidate will have experience in drafting and CAD software, with a keen eye for detail and accuracy. Responsibilities include creating and updating drawings based on site measurements and ensuring compliance with project specifications. Familiarity with Autodesk Revit is a plus. Please review and let me know the cost and timeline. We need this completed by end of next week 8/7/2026. Sooner is better, we will take up offers from folks who can do it sooner. Looking for some CAD work to turn the redlined drawings in Record Drawings. At the link below, you would see two folders. One is the original set of drawings including PDF and CAD. Another folder reflects the construction work in as-built redlined format. These redlines need to be incorporated into the CAD files. Some guidelines are copied below for your reference. https://www.dropbox.com/scl/fo/ixys12ii2i60sq3rf8vly/ACCh_Io2uQ7X70_KZql6474?rlkey=vbdr17jysejytk6uy8rp0ifd4&st=bvgz0g2b&dl=0 Renaming files (see full description below) - use W912HP23F6006 as a contract #, followed by bldg #, B563 or B572, then followed by sheet number. ===== 3.2 RECORD DRAWING FILES If additional drawings are required, prepare them using the specified electronic file format applying ERDC/ITL TR-12-6 and ERDC/ITL TR-12-1. The title block and drawing border to be used for any new final record drawings must be identical to that used on the contract drawings. Accomplish additions and corrections to the contract drawings using CAD files. Provide all program files and hardware necessary to prepare final PDF record drawings. The Contracting Officer will review final PDF record drawings for accuracy and return them to the Contractor for required corrections, changes, additions, and deletions. 3.2.1 Rename the CAD Drawing files Rename the CAD Drawing files using the contract number as the Project Code a. For AutoCAD files (DWG), enter all as-built delta changes and notations on the AS-BUILT layer. b. When final revisions have been completed, show the wording "RECORD DRAWING AS-BUILTS" followed by the name of the Contractor in letters at least 3/16 inch high on the cover sheet drawing. Date RECORD DRAWING AS-BUILTS" drawing revisions in the revision block. 3.3 RECORD DRAWINGS Prepare final record drawings after the completion of each definable feature of work as listed in the Contractor Quality Control Plan (such as Foundations, Utilities, or Structural Steel as appropriate for the project). Transfer the changes from the approved working as-built markup drawings to the original electronic CAD drawing files. Modify the as-built CAD drawing files to correctly show the features of the project as-built by bringing the working CAD drawing set into agreement with approved working as-built markup drawings, and adding such additional drawings as may be necessary. Refer to ERDC/ITL TR-12-1. Jointly review the working as-built markup drawings with printouts from working as-built CAD drawing PDF files for accuracy and completeness. Monthly review of working as-built CAD drawing PDF file printouts must cover all sheets revised since the previous review. These PDF drawing files are part of the permanent records of this project. Any drawings damaged or lost must be satisfactorily replaced at no expense to the Government. Drawing revisions (include within change order price the cost to change working and final record drawings to reflect revisions) and compliance with the following procedures. a. Follow directions in the revision for posting descriptive changes. b. The revision delta size must be 5/16 inch unless the area where the delta is to be placed is crowded. Use a smaller size delta for crowded areas. c. Place a revision delta at the location of each deletion. d. For new details or sections which are added to a drawing, place a revision delta by the detail or section title. e. For minor changes, place a revision delta by the area changed on the drawing (each location). f. For major changes to a drawing, place a revision delta by the title of the affected plan, section, or detail at each location. g. For changes to schedules or drawings, place a revision delta either by the schedule heading or by the change in the schedule. 3.3.1 Final Record Drawing Package Submit the final record PDF and CAD drawings package for the entire project. Submit one set of ANSI D size PDF and CAD files, two sets of ANSI D size prints and one set of the approved working record drawings. The package must be complete in all details and identical in form and function to the contract drawing files supplied by the Government.
- Less than 30 hrs/weekHourly
- 1-3 monthsDuration
- ExpertExperience Level
- Remote Job
- Ongoing projectProject Type
Skills and Expertise
Activity on this job
- Proposals:15 to 20
- Last viewed by client:4 hours ago
- Hires:1
- Interviewing:6
- Invites sent:30
- Unanswered invites:20
About the client
- United StatesLivonia4:54 AM
- $9.9K total spent22 hires, 9 active
- 102 hours
- Mid-sized company (10-99 people)
Explore similar jobs on Upwork
How it works
Create your free profileHighlight your skills and experience, show your portfolio, and set your ideal pay rate.
Work the way you wantApply for jobs, create easy-to-by projects, or access exclusive opportunities that come to you.
Get paid securelyFrom contract to payment, we help you work safely and get paid securely.
About Upwork
- 4.9/5(Average rating of clients by professionals)
- G2 2021#1 freelance platform
- 49,000+Signed contract every week
- $2.3BFreelancers earned on Upwork in 2020
Find the best freelance jobs
Growing your career is as easy as creating a free profile and finding work like this that fits your skills.
Trusted by