You will get detailed measurement/take off for EXTERNAL CLADDING WORKS


Project details
Time & Cost saving, I can guarantee accuracy in your every project's material quantity take offs. Starting at $60 for 1000sqft of metal cladding, you will get the job done with revision. You won't be charge until you're satisfied with the result.
Project Type
Data Entry, Project Management, Virtual Assistance, OtherWhat's included
| Service Tiers |
Starter
$60
|
Standard
$100
|
Advanced
$150
|
|---|---|---|---|
| Delivery Time | 5 days | 3 days | 2 days |
Number of Revisions | 1 | 1 | 1 |
About Geraldine
Quantity Surveyor | Construction Estimator | Cost Engineer
Batangas, Philippines - 10:16 pm local time
1. Hotels
2. Condominiums
3. Residential houses
4. Commercial buildings
5. Industrial buildings
6. Infrastructure projects (roads, bridges, subdivisions)
I also provide takeoff and markups for the following trades:
-Earthworks Cut&Fill, Excavation, Grading, Shoring, Pile
-Civil Works, Pipes (stormwater, water, sewer, fire)
-Concreting, Reinforcement
-Masonry, Retaining Wall, diaphragm wall
-Formworks
-Structural Steel, Fire Proofing
-Ceilings, Drywall, Partition
-Painting, Rendering, Cladding
-Floor Finishes, Tiling, Epoxy Floor
-Roofing, Deck, Waterproofing
-Architectural Precast, Glass Fiber Reinforced Concrete
-Steel Balconies, Bolt-on Deck, Canopies, Steel Railings
-Doors, Windows, Roller Shades
I can also do the following:
-Preparation of Variation Orders (additive/deductive)
-Preparation of BOQ (provided you have the rates)
-Doing quantity comparison/reconciliation
-Bar Bending ScheduleTurnaround is 2-3 working days depending on the complexity of the project.
Steps for completing your project
After purchasing the project, send requirements so Geraldine can start the project.
Delivery time starts when Geraldine receives requirements from you.
Geraldine works on your project following the steps below.
Revisions may occur after the delivery date.
Receive complete drawings from the client.
The Client will send the drawings in pdf format. Complete drawings includes but not limited to Plan, Elevation Drawings, Section drawings and section/details of the materials to take off.
Upon receiving/checking the drawings, quantity taking off will start.
Materials take off in Excel together with the marked-up drawings will be delivered via email to the Client for review.

