You will get Autodesk Revit | HVAC & MEP
Project details
Why This Works:
Fear-based hook ("Stop costly errors")
Quantifiable results ("120+ clashes")
Clear CTA
I run Navisworks clash tests to expose MEP, structural, and architectural conflicts before breaking ground. My reports include priority rankings and BIM 360 integration—saving clients 6-figure rework costs (see Qatar hospital case).
Send your models—I’ll flag top 3 clashes for free.
Fear-based hook ("Stop costly errors")
Quantifiable results ("120+ clashes")
Clear CTA
I run Navisworks clash tests to expose MEP, structural, and architectural conflicts before breaking ground. My reports include priority rankings and BIM 360 integration—saving clients 6-figure rework costs (see Qatar hospital case).
Send your models—I’ll flag top 3 clashes for free.
Field of Expertise
Mechanical, Electrical, & PlumbingBuilding Type
Office & Work SpaceBIM Software
Autodesk Revit, Autodesk Navisworks, Autodesk Civil 3DFile Format
RVT, RFA, DWG, IFC, OtherWhat's included
| Service Tiers |
Starter
$146
|
Standard
$246
|
Advanced
$446
|
|---|---|---|---|
| Delivery Time | 3 days | 6 days | 9 days |
Number of Revisions | Unlimited | Unlimited | Unlimited |
HTML Clash Report | - | ||
Clash Report Files (NWD) | - | - | |
Coordinated Model |
Optional add-ons
You can add these on the next page.
Fast Delivery
+$46 - $172About Israr
BIM Engineer | Revit Civil 3D
Battagram, Pakistan - 3:12 pm local time
𝐏𝐫𝐨𝐛𝐥𝐞𝐦 1. We have thousands of clashes but no one fixes them.
𝐌𝐲 𝐅𝐢𝐱 I run Navisworks clash tests, manually group by level/discipline, assign to correct teams, and deliver a report with screenshots, IDs, and action items. You know exactly who does what by Friday.
𝐏𝐫𝐨𝐛𝐥𝐞𝐦 2. Our client wants new family naming across all disciplines. Manually? That's weeks."
✅ 𝐌𝐲 𝐅𝐢𝐱. I use batch renaming tools (DiRoots, pyRevit) with an Excel mapping document. 9 disciplines. Thousands of families. Done in 5 days. Zero errors.
𝐏𝐫𝐨𝐛𝐥𝐞𝐦 3 Our ACC folder is chaos. No one knows which model is current.
✅ 𝐌𝐲 𝐅𝐢𝐱. I set up permissions, naming conventions, issue tracking, and a weekly publication rule. Your team stops asking "which file is latest?
𝐏𝐫𝐨𝐛𝐥𝐞𝐦4. Our BIM coordinator just left. Deadlines are close.
✅ 𝐌𝐲 𝐅𝐢𝐱. I step in same day. Audit your models. Run clash tests. Produce a 3-day action plan. No ramp-up time wasted.
𝗪𝗵𝗼 𝗜 𝗔𝗺
I am a BIM Coordinator with deep technical hands-on mastery of Revit, Civil 3D, Navisworks, and ACC. I am new to the title but not new to solving BIM problems. I was the person coordinators called to fix their models. Now I lead coordination.
My Technical Toolkit
𝐍𝐚𝐯𝐢𝐬𝐰𝐨𝐫𝐤𝐬 𝐌𝐚𝐧𝐚𝐠𝐞 (Clash detection, manual grouping, Search/Selection Sets, TimeLiner (4D), HTML/XML reports)
𝗥𝗲𝘃𝗶𝘁 (Architecture, Structure, MEP – modeling, auditing, family management)
𝗖𝗶𝘃𝗶𝗹 𝟯𝗗 (Surfaces, alignments, corridors, coordinating with Revit models)
𝐀𝐂𝐂 / 𝐁𝐈𝐌 𝟑𝟔𝟎 (Folder structure, permissions, issue tracking, model consumption)
𝗗𝗶𝗥𝗼𝗼𝘁𝘀 / 𝗽𝘆𝗥𝗲𝘃𝗶𝘁 (Batch family renaming, parameter management, sheet creation)
𝐖𝐡𝐚𝐭 𝐑𝐞𝐜𝐞𝐧𝐭 𝐂𝐥𝐢𝐞𝐧𝐭𝐬 𝐇𝐚𝐯𝐞 𝐒𝐚𝐢𝐝 (𝐒𝐮𝐦𝐦𝐚𝐫𝐢𝐳𝐞𝐝)
He caught clashes we missed for months."
His reports are clear enough for engineers who never open Navisworks.
"The family renaming that we thought would take 3 weeks took 5 days."
𝐇𝐨𝐰 𝐖𝐞 𝐖𝐨𝐫𝐤 𝐓𝐨𝐠𝐞𝐭𝐡𝐞𝐫
You message me with your problem and Revit version
I reply within 4 hours with specific questions and a timeline
We hop on a quick call (10 min) to confirm scope
I deliver on time, documented, ready for your client
𝐈 𝐀𝐦 𝐁𝐞𝐬𝐭 𝐅𝐨𝐫
✅ BIM Managers who need weekly clash reports
✅ Project leads frustrated with unresolved coordination issues
✅ Teams transitioning to ACC from local servers
✅ Clients who changed naming/template standards last minute
✅ Late-stage projects with 5,000+ clashes and no ownership
𝗜 𝗔𝗺 𝗡𝗢𝗧 𝗙𝗼𝗿
❌ Projects where no one has time for coordination meetings
❌ Clients looking for the cheapest rate (I deliver value, not low price)
❌ Teams who refuse to document decisions
𝗠𝘆 𝗚𝘂𝗮𝗿𝗮𝗻𝘁𝗲𝗲 𝘁𝗼 𝗬𝗼𝘂
If I take your project, I will respond within 4 hours to every message. I will document everything. I will not guess if I don't know something, I will tell you exactly when you will get the answer. And I will deliver on time.
𝐑𝐞𝐚𝐝𝐲 𝐭𝐨 𝐟𝐢𝐱 𝐲𝐨𝐮𝐫 𝐁𝐈𝐌 𝐩𝐫𝐨𝐛𝐥𝐞𝐦𝐬?
Send me a message with:
1) Your biggest coordination headache right now
2) Number of disciplines in your model
3) Your Revit and Navisworks versions
I will reply within 4 hours with specific next steps. No generic proposals. Just solutions.
Steps for completing your project
After purchasing the project, send requirements so Israr can start the project.
Delivery time starts when Israr receives requirements from you.
Israr works on your project following the steps below.
Revisions may occur after the delivery date.
Completion
The project will advance in stages (30%, 60%, 90%) with reviews between each. Final execution begins only after these are completed.