You will get Quantities take-off for Civil Engineering and Building works

Abass A.Status: Offline
Abass A. Abass A.
4.8
Top Rated

Let a pro handle the details

Buy Other Building Information Modeling services from Abass, priced and ready to go.
Abass A.Status: Offline
Abass A. Abass A.
4.8
Top Rated

Let a pro handle the details

Buy Other Building Information Modeling services from Abass, priced and ready to go.

Project details

I provide a quantities take off for Civil,MEP,Low voltage quantity take-off from drawings and I'm unique because of my expertise in the use of quantity take-off softwares(Planswift and Bluebeam Revu) are exceptional with a strong analytical and mathematical skills. I delivered quantity take-off accurately with no mistakes in specific period of time.

Also, I ensure my clients get best value for their money by providing quality deliverables in a well presentable manner and my clients satisfaction is my priority.

Thanks and warm regards!
Field of Expertise
Architectural
Building Type
Residential
BIM Software
Autodesk Revit, Bluebeam Revu, Other
File Format
DWG, Other
What's included
Service Tiers Starter
$50
Standard
$80
Advanced
$100
Delivery Time 1 day 1 day 1 day
Number of Revisions
222
4.8
20 reviews
85% Complete
10% Complete
1% Complete
(0)
5% Complete
1% Complete
(0)

AH

Albert H.
5.00
May 12, 2026
Construction material takeoff needed urgently. Abass provided accurate material takeoff and cost estimation with great attention to detail. Thanks for the great job done.

CH

Carolina H.
5.00
Feb 10, 2026
Estimator for Quantity Takeoffs — Ground-Up Homes & Commercial (US Daytime Hours)

BS

Bryan S.
5.00
Feb 7, 2026
Commercial Roofing Takeoff Specialist (Long-Term Partnership)

WB

Wesley B.
5.00
Jan 15, 2026
Estimation & Takeoff Training (Africa Only)

AB

Avinash B.
5.00
Aug 22, 2025
Cost Estimation Training for CSI of BOQ and Schedule of values Excellent at his work
Abass A.Status: Offline

About Abass

Abass A.Status: Offline
Quantity Surveyor|Construction Estimator |MEP Estimator|BOQ Specialist
100% Job Success
4.8  (20 reviews)
Lagos, Nigeria - 2:08 am local time
With 10 years (+) of experience in Quantity surveying, Cost estimation and Project Management, utilizing cutting-edge resources like Planswift, Bluebeam Revu, AutoCad, Revit, Microsoft Excel, Price a Job, NRM2, Master Format CSI, RS Means, Australian BCIS, and Spon's price book. I'll ensure your bids stand out and your preferred projects become reality. Let's build success together! You will be getting a detailed Construction Cost Estimate, Quantity Takeoff, and Material take off list for all the CSI divisions.

MY SERVICES:

Include material takeoff and cost estimate for:

Div. 01 — General Conditions,

Div. 02 — Site Preparation (demolition, erosion control, clearing debris, etc.)

Div. 03 — Concrete (footing, foundation, slab, pavements, etc.)

Div. 04 — Masonry (CMU blocks, brick veneer, etc.)

Div. 05 — Metal (structural metal, reinforcing steel bars, etc.)

Div. 06 — All Lumber Work (studs, joists, trusses, rafters , headers, etc.)

Div. 07 — Insulations (caulking, batt insulation, rigid insulation, spray foam insulation, blown-in insulation etc.)

Div. 07 — Roofing (shingles, standing seam metal, cedar shake, tpo membrane, flat roofs, etc.)

Div. 07 — Exterior Finishes (siding, stucco finish, metal paneling, trims, soffits, fascia/frieze boards, etc.)

Div. 08 — Openings (doors, windows, storefronts, skylights, louvers, vents, etc.)

Div. 09 — Drywalls/Sheetrock (tapping, mud plastering, sealant, drywall screws, etc.)

Div. 09 — Finishes (flooring, baseboards, tiling, wall covering, ceiling, crown molding, etc.)

Div. 10 — Specialties (bath accessories etc.)

Div. 11 — Equipment (washer/dryer, oven, cooking range, refrigerator, etc.)

Div. 12 — Furnishings (countertops, islands, vanities, etc.)

Div. 6/12 — Millwork (upper/base cabinets, closet/WIC rod and shelving, linen/pantry shelving, etc.)

Div. 22 — Plumbing (pipes, fixtures etc.)

Div. 23 — HVAC (ducts, diffusers/grilles etc.)

Div. 26 — Electrical (power, lighting fixtures etc.)

Div. 31 — Earthwork (grading, excavation, backfill etc.)

Div. 32 — Exterior Improvements (landscaping, hardscaping, fencing etc.)

Why Estimator Abass for your project?

1. Completed hundreds of US-based residential as well as commercial projects

2. Accurate Material Takeoff and Reliable Cost Estimate

3. Accuracy

4. Quick turnaround

5. Unlimited revisions

6. I will help you winning more bids by accurate material take off and Construction estimation for any CSI division.

I've done a lot of estimates for the Australian, UK, Canada, Qatar, Dubai, US, New Zealand and Nigeria based firms. These include commercial, industrial, residential, sports center, hospitals, malls, and hotels.

I use Microsoft Package(MS Excel, MS Project, MS Word, PowerPoint), AutoCAD, Revit, PlanSwift, Bluebeam Revu, Primavera P6, RSmeans, Price a Job, Spon's price book (as per client license).

On the other hand, I can also do CAD works, some rendering and other Architectural works. Feel free to message me, Let's build success together. Thank you!

Warm regards,
Estimator Abass A.

Steps for completing your project

After purchasing the project, send requirements so Abass can start the project.

Delivery time starts when Abass receives requirements from you.

Abass works on your project following the steps below.

Revisions may occur after the delivery date.

Tell me your requirement/scope of the project

Tell me what you need me to do for you

Send the project documents

Send me the drawings you need to take off for.

Review the work, release payment, and leave feedback to Abass.