You will get I'll build a rate limiter to protect your API from abuse and cost overrun.

Project details
Built with atomic Redis Lua scripting, not naive counters — so it stays correct under real concurrent traffic, not just in a single-user test. Live and deployed, with a real-time dashboard so limits are visible, not a black box.
Programming Languages
HTML & CSS, JavaScript, JavaCoding Expertise
Cross Browser & Device Compatibility, Performance Optimization, SecurityWhat's included
| Service Tiers |
Starter
$120
|
Standard
$200
|
Advanced
$350
|
|---|---|---|---|
| Delivery Time | 3 days | 5 days | 8 days |
Number of Revisions | 1 | 3 | Unlimited |
Design Customization | - | - | - |
Content Upload | - | - | - |
Responsive Design | - | - | - |
Source Code | - | - | - |
Optional add-ons
You can add these on the next page.
Fast Delivery
+$30 - $80
Additional Revision
+$30About Atul
AI Agent & Web Developer
Gandhinagar, India - 6:20 am local time
I've designed and deployed three production systems from scratch:
→ An AI assistant that answers real questions about your business by pulling live numbers from your spreadsheet or database, instead of guessing or making things up, it runs the actual query and gives you the real answer, every time, , without ever sending your raw data to a third-party AI model.
→ A safeguard that keeps your app fast and stable even when hundreds of people hit it at once , it automatically limits how much each user can do, so one person (or a bug, or an attack) can't slow things down or rack up costs for everyone else.
→ A background task system that lets your app process many jobs at the same time without getting overwhelmed or losing work, built for businesses that need things to happen reliably behind the scenes, even under heavy load. (built with Redis for atomic, race-condition-free concurrency)
Everything above is live and running in production, not a demo or prototype. If you need something that works reliably with your real data and real traffic, let's talk.
Steps for completing your project
After purchasing the project, send requirements so Atul can start the project.
Delivery time starts when Atul receives requirements from you.
Atul works on your project following the steps below.
Revisions may occur after the delivery date.
Kickoff call/message
Confirm your API structure, traffic patterns, and which user tiers need different limits.
Setup & integration
Connect the rate limiter to your existing API and configure Redis.