You will get a HVAC project asap with takeoff include!
Top Rated

Project details
You will get a complete report of thermal loads, generated by a commercial software; 2D or 3D duct system blueprints, including specifications; and a spreadsheet with all the necessary equipment, materials and the amount of man-hours required for the execution of your project.
Field of Expertise
Mechanical, Electrical, & PlumbingBuilding Type
Office & Work SpaceBIM Software
ArchiCAD, Autodesk AutoCAD, Bluebeam RevuFile Format
RVT, RFA, DWG, IFC, RTEWhat's included
| Service Tiers |
Starter
$100
|
Standard
$300
|
Advanced
$500
|
|---|---|---|---|
| Delivery Time | 1 day | 3 days | 5 days |
Number of Revisions | 1 | 3 | 5 |
Number of 2D Drawings | 1 | 3 | 5 |
Level of Detail | 1 | 3 | 5 |
Number of Renderings | 1 | 3 | 5 |
Design Analysis | |||
Architectural Walkthrough | |||
Native BIM Source Files | |||
Model Audit & Verification |
Frequently asked questions
38 reviews
(32)
(5)
(0)
(1)
(0)
This project doesn't have any reviews.
EE
Evelyn E.
Apr 24, 2026
Mechanical HVAC Design Engineer
Efficient & qualitative
OH
Oscar H.
Mar 25, 2026
HVAC Take-off Specialist
Edward is professional and very knowledgable. We could always trust that our take off will be accurate. He took feedback to improve the process and the templates. We slowed down our commercial jobs, but we will definitely be working with Edward in the future.
FD
Fenelon D.
May 1, 2025
Heat and cooling calculation REVIT
Edward is a great professional, highly recommendable
JG
Jared G.
Apr 9, 2025
Need an HVAC Expert for Manual S & Manual D – Urgent!
AS
Amanda S.
Mar 13, 2025
HVAC Designer
About Edward
HVAC Engineer
100%
Job Success
Maracay, Venezuela - 10:53 pm local time
If you want the best quality job in short time, i´m your best choice.
Steps for completing your project
After purchasing the project, send requirements so Edward can start the project.
Delivery time starts when Edward receives requirements from you.
Edward works on your project following the steps below.
Revisions may occur after the delivery date.
Thermal loads calculation according to design conditions.
Considering all conditions related to the building, like: construction materials, location, cardinal orientation, climatic region and others, I determine the equipments specifications needed (BTU´s and CFM´s) to reach the temperature required.
Equipment´s Pre-selection and location. Ductwork routes and pipes sizes.
Determine the best location for the equipments, and their ductwork, taking into consideration, the client opinion and aesthetic aspects, optimizing space and saving energy.

