You will receive a complete Reactive Power Capability Study for a solar PV, wind, or BESS project using DIgSILENT PowerFactory.
The study will evaluate the plant’s leading and lagging reactive power capability at the Point of Interconnection across the required active-power and voltage operating range. I will develop P–Q and V–Q capability curves, assess compliance with the applicable Grid Code or utility requirements, and identify any reactive power shortfall.
When additional compensation is required, I will provide selection and sizing of suitable equipment such as STATCOMs, capacitor banks, or shunt reactors.
The final package may include:
P–Q and V–Q capability curves
POI reactive power and power-factor results
Grid Code compliance assessment
Reactive power compensation recommendations
Simulation tables and plots
Updated model files
Professional technical report
The scope will be adapted to your plant configuration, available model, and utility requirements.
The study will evaluate the plant’s leading and lagging reactive power capability at the Point of Interconnection across the required active-power and voltage operating range. I will develop P–Q and V–Q capability curves, assess compliance with the applicable Grid Code or utility requirements, and identify any reactive power shortfall.
When additional compensation is required, I will provide selection and sizing of suitable equipment such as STATCOMs, capacitor banks, or shunt reactors.
The final package may include:
P–Q and V–Q capability curves
POI reactive power and power-factor results
Grid Code compliance assessment
Reactive power compensation recommendations
Simulation tables and plots
Updated model files
Professional technical report
The scope will be adapted to your plant configuration, available model, and utility requirements.
Field of Expertise
Mechanical, Electrical, & PlumbingBuilding Type
IndustrialBIM Software
OtherFile Format
DWG, OtherWhat's included
| Service Tiers |
Starter
$150
|
Standard
$300
|
Advanced
$500
|
|---|---|---|---|
| Delivery Time | 2 days | 4 days | 6 days |
Number of Revisions | 1 | 2 | 3 |
HTML Clash Report | - | - | - |
Clash Report Files (NWD) | - | - | - |
Coordinated Model | - | - | - |
Optional add-ons
You can add these on the next page.
Additional Revision
+$50Frequently asked questions
3 reviews
(3)
(0)
(0)
(0)
(0)
This project doesn't have any reviews.
RA
Reagan A.
Dec 24, 2025
Renewable Energy RMS simulations using DigSILENT
Excellent expertise in this area, especially RMS simulations.
RA
Reagan A.
Oct 26, 2025
Quasi Dynamic Simulations of Power Plant in DIgSILENT PowerFactory
RA
Reagan A.
Oct 3, 2025
Hybrid Plant modelling in DigSILENT
A great freelancer for Power Systems. Modelled my hybrid system using DigSilent and delivered all results in a detailed report. I will be using him again as he is very knowledgeable and comfortable in this area
About Diyorbek
Power Systems Engineer |NERC, Grid Studies, PSS/E, ETAP & DIgSILENT
Tashkent, Uzbekistan - 6:33 am local time
I help utilities, EPCs, developers, and consultants prepare accurate system models, protection settings, simulation results, and submission-ready technical reports using DIgSILENT PowerFactory, ETAP, PSCAD/EMTDC, and PSS®E.
Core services:
• Load flow and voltage profile studies
• Short-circuit studies according to IEC 60909 / ANSI
• N-1 / N-2 contingency analysis
• Reactive Power Capability Study
• Grid Code Compliance Study
• Electrical equipment selection based on power system study results
• Protection coordination and relay settings
• Arc flash hazard analysis according to IEEE 1584
• Grid Impact Assessment and interconnection studies
• Renewable integration studies for solar PV, wind, and BESS
• Harmonic and resonance studies
• EMT studies: transformer energization, switching transients, lightning, LVRT/HVRT
• MOD / PRC / Grid Code compliance
Software:
• DIgSILENT PowerFactory
• ETAP
• PSCAD / EMTDC
• PSS®E
Typical deliverables:
• Technical report in PDF / Word format
• Simulation model files when required
• Short-circuit and load-flow result tables
• Protection settings and TCC curves
• Arc flash incident energy tables and label data
• Compliance summary and recommendations
• Excel calculation sheets
Relevant experience includes:
• PRC-023 / PRC-025 relay setting compliance reviews
• MOD-025 / MOD-026 / MOD-027 support for renewable and generation projects
• Arc flash studies for MV and LV systems
• PSCAD EMT and DIgSILENT RMS/EMT studies for solar, wind, and BESS projects
• Harmonic, resonance, switching transient, and insulation coordination studies
My focus is to provide clear engineering results, practical recommendations, and reports that can be reviewed by utilities, owners, EPCs, lenders, and technical consultants.
Steps for completing your project
After purchasing the project, send requirements so Diyorbek can start the project.
Delivery time starts when Diyorbek receives requirements from you.
Diyorbek works on your project following the steps below.
Revisions may occur after the delivery date.
Review Project Data and Grid Code Requirements
I will review the plant configuration, equipment parameters, POI requirements, operating scenarios, and applicable reactive power criteria
Build or Validate the Power System Model
I will create or verify the plant model, including generators, inverters, transformers, cables, external grid, STATCOMs, capacitors, and reactors.