You will get an accurate Material Takeoff, Cost Estimate and Quantity Surveying services

You will get an accurate Material Takeoff, Cost Estimate and Quantity Surveying services

Project details
Looking for an Expert Quantity Surveyor and Cost Estimator, fortunately you came to right place. I have 4 years of experience and high expertise in taking all types of material take-offs of a project and then estimating their cost. If you are going for bidding of project or execution of project, I can serve you with both of your purposes with my Estimation Skills. I will provide you a proper final excel sheet in with all your scope of work, arranged in CSI Divisions.
The services that I offer and specialize are, but not limited to;
Site Works Takeoff/Estimate (Demolition, Grading, Pavements, Sanitary/Storm/Drainage Lines, Landscaping)
Architectural Takeoff/Estimate (Ceiling, Drywall, Flooring, Furring, WallFramings and All types of Finishes)
Structural Takeoff/Estimate (Joists, Rafters, Beams, Concrete, Reinforcement, CBU Walls, Masonry etc)
Mechanical Takeoff/Estimate (Ducts, Diffusers, Pumps etc)
Electrical Takeoff/Estimate (Switches, Lights, Receptacles etc)
Plumbing Takeoff/Estimate (Sanitary Pipes, Drainage Pipe, Vent Pipes, Hot & Cold Water Pipes etc)
The services that I offer and specialize are, but not limited to;
Site Works Takeoff/Estimate (Demolition, Grading, Pavements, Sanitary/Storm/Drainage Lines, Landscaping)
Architectural Takeoff/Estimate (Ceiling, Drywall, Flooring, Furring, WallFramings and All types of Finishes)
Structural Takeoff/Estimate (Joists, Rafters, Beams, Concrete, Reinforcement, CBU Walls, Masonry etc)
Mechanical Takeoff/Estimate (Ducts, Diffusers, Pumps etc)
Electrical Takeoff/Estimate (Switches, Lights, Receptacles etc)
Plumbing Takeoff/Estimate (Sanitary Pipes, Drainage Pipe, Vent Pipes, Hot & Cold Water Pipes etc)
Project Type
ArchitectureWhat's included
Service Tiers |
Starter
$60
|
Standard
$100
|
Advanced
$140
|
---|---|---|---|
Delivery Time | 2 days | 3 days | 4 days |
Number of Revisions | Unlimited | 0 | 0 |
Source Files | - | - |
67 reviews
(64)
(3)
(0)
(0)
(0)
This project doesn't have any reviews.
SN
Simon N.
Apr 25, 2024
Residential BoQ
MW
Mark W.
Feb 14, 2020
Take-off for small Residential new construction project
Prompt attention and good communication!
NA
Nick A.
Jan 17, 2020
3 Bristol Street - BOQ (trade measure) required
NA
Nick A.
Jan 17, 2020
Essendon Fields - Terminal Construction BOQ (trade measure) required
Met deadlines and was proactive
MR
Marquis R.
Jan 13, 2020
Estimator needed on an hourly basis
Abu is a great estimator. Was able to get takeoffs done under pressure with a short timeframe.
About Abu
Civil Engineer || Quantity Surveyor || Cost Estimator
Sydney, Australia - 11:07 pm local time
The services that I offer and specialize are, but not limited to;
Site Works Takeoff/Estimate (Demolition, Grading, Pavements, Sanitary/Storm/Drainage Lines, Landscaping)
Architectural Takeoff/Estimate (Ceiling, Drywall, Flooring, Furring, WallFramings and All types of Finishes)
Structural Takeoff/Estimate (Joists, Rafters, Beams, Concrete, Reinforcement, CBU Walls, Masonry etc)
Mechanical Takeoff/Estimate (Ducts, Diffusers, Pumps etc)
Electrical Takeoff/Estimate (Switches, Lights, Receptacles etc)
Plumbing Takeoff/Estimate (Sanitary Pipes, Drainage Pipe, Vent Pipes, Hot & Cold Water Pipes etc)
Steps for completing your project
After purchasing the project, send requirements so Abu can start the project.
Delivery time starts when Abu receives requirements from you.
Abu works on your project following the steps below.
Revisions may occur after the delivery date.
Send me Plans and Scope
First step is before starting the project contact me. Send me the drawings and scope of your project then i will tell you the estimated time and budget for your project. Once we both agree to the terms, then i will start your project.