You will get CAD redesigns for laser cutting, bending, welding + tech drawings


Project details
I have five years of professional experience in project management. I can proactively identify potential failures in production processes and revise designs to prevent these issues. I am proficient in creating flawless technical drawings for manufacturing. Leveraging my experience in the automotive industry, I can deliver high-quality, professional results.
Materials
MetalField of Expertise
Automotive, Furniture, MachineryDesign Software
AutoCAD, CATIA, Fusion 360, Inventor, SolidWorksFile Format
3DS, DWG, PDF, SLDPRT, STEPWhat's included $20
These options are included with the project scope.
$20
- Delivery Time 2 days
- Number of Revisions Unlimited
- Number of Drawings 10
- Unlimited Drawings
- Source Files
Optional add-ons
You can add these on the next page.
Fast 1 Day Delivery
+$10About Kaan Egemen
Mechanical Engineer | CAD Modeling & Creative Visual Design
Ankara, Turkey - 11:07 am local time
I am a Mechanical Engineer with strong design skills and a passion for creativity. My background allows me to deliver high-quality results both in engineering projects (sheet metal design, CAD modeling, product development) and in creative visual design (brochures, invitations, and marketing materials).
🔧 Engineering & Technical Design:
Sheet metal product design and manufacturing experience
3D CAD modeling & technical drawings (SolidWorks, AutoCAD, etc.)
Functional and production-ready solutions
🎨 Creative Graphic Design:
Brochure, invitation, and catalog design
Modern and elegant layouts tailored to your needs
Print-ready and digital formats
✅ By combining technical precision with creative design, I can help you achieve results that are both functional and visually appealing.
Steps for completing your project
After purchasing the project, send requirements so Kaan Egemen can start the project.
Delivery time starts when Kaan Egemen receives requirements from you.
Kaan Egemen works on your project following the steps below.
Revisions may occur after the delivery date.
Appropriate processes and equipment are selected.