You will get Electrical Power Solutions | Solar PV | Autocad 2D/3D | Technical Reports

Engr Sajjad U.Status: Offline
Engr Sajjad U. Engr Sajjad U.
4.9
Top Rated

Let a pro handle the details

Buy Other Design services from Engr Sajjad, priced and ready to go.
Engr Sajjad U.Status: Offline
Engr Sajjad U. Engr Sajjad U.
4.9
Top Rated

Let a pro handle the details

Buy Other Design services from Engr Sajjad, priced and ready to go.

Project details

Lš—¶š—°š—²š—»š˜€š—²š—± š—˜š—¹š—²š—°š˜š—æš—¶š—°š—®š—¹ š—£š—¼š˜„š—²š—æ š˜€š˜†š˜€š˜š—²š—ŗš˜€ š—˜š—»š—“š—¶š—»š—²š—²š—æ š˜„š—¶š˜š—µ š—® š—½š—æš—¼š˜ƒš—²š—» š˜š—æš—®š—°š—ø š—æš—²š—°š—¼š—æš—± š—¼š—³ šŸ“ š—¬š—²š—®š—æš˜€.
The following Services are Offered but not limited to,
1. š—£š—¼š˜„š—²š—æ š—¦š˜†š˜€š˜š—²š—ŗ š—”š—»š—®š—¹š˜†š˜€š—¶š˜€: • Load Flow Analysis • Short Circuit Analysis • Transient Stability Analysis
2. š—£š—¼š˜„š—²š—æ š—¦š˜†š˜€š˜š—²š—ŗ š——š—²š˜€š—¶š—“š—»: • Substation Design • Power Distribution System Design • Electrical Panel Design
3. š—„š—²š—»š—²š˜„š—®š—Æš—¹š—² š—˜š—»š—²š—æš—“š˜†: • Solar Power Systems • Wind Power Systems • Hybrid Power Systems
4. š—–š—¼š—»š˜š—æš—¼š—¹ š—¦š˜†š˜€š˜š—²š—ŗš˜€: • PLC Programming • SCADA Systems
5. š—£š—¼š˜„š—²š—æ š—˜š—¹š—²š—°š˜š—æš—¼š—»š—¶š—°š˜€: • Converters and Inverters • Power Quality Improvement
6. š—˜š—¹š—²š—°š˜š—æš—¶š—°š—®š—¹ š—”š˜‚š˜š—¼š—–š—”š——: • Schematic Diagrams • Layouts and Drafting • 3D Modeling
7. š—˜š—»š—²š—æš—“š˜† š—˜š—³š—³š—¶š—°š—¶š—²š—»š—°š˜†: • Energy Audits • Demand Side Management • Power Factor Correction
8. š—§š—²š—°š—µš—»š—¶š—°š—®š—¹ š—„š—²š—½š—¼š—æš˜ š—Ŗš—æš—¶š˜š—¶š—»š—“: • Preparation of Technical Documentation • Feasibility Studies • Project Reports
9. š—¦š—¶š—ŗš˜‚š—¹š—®š˜š—¶š—¼š—» š—¦š—¼š—³š˜š˜„š—®š—æš—²: • MATLAB/Simulink • ETAP • Pvsyst • Autocad (Many other software)

š—§š—µš—®š—»š—ø š˜†š—¼š˜‚ š—³š—¼š—æ š˜ƒš—¶š˜€š—¶š˜š—¶š—»š—“.
What's included
Service Tiers Starter
$30
Standard
$60
Advanced
$300
Delivery Time 1 day 3 days 5 days
Number of Revisions
555
Source Files
Optional add-ons You can add these on the next page.
Additional Revision
+$10
4.9
213 reviews
97% Complete
2% Complete
1% Complete
1% Complete
1% Complete
(0)

VB

Vanessa B.
5.00
Nov 21, 2025
You will get Solar System Design and Energy simulation Analysis

VB

Vanessa B.
5.00
Nov 21, 2025
You will get Solar System Design and Energy simulation Analysis

VB

Vanessa B.
5.00
Nov 21, 2025
You will get Solar System Design and Energy simulation Analysis

TP

Todd P.
5.00
Nov 27, 2024
You will get Solar System Design and Energy simulation Analysis Sajjad was contacted and within a few minutes we started working together. He was very polite and answered all questions about my solar project.

Thanks Sajjad for all the help!

MM

Mike M.
5.00
Nov 8, 2024
You will get any circuit analysis and design assignment
Engr Sajjad U.Status: Offline

About Engr Sajjad

Engr Sajjad U.Status: Offline
Solar PV | Battery Storage (BESS) | Hybrid Renewable Energy Systems
100% Job Success
4.9 Ā (213 reviews)
Lahore, PakistanĀ - 10:14 pm local time
š—œ š—®š—ŗ š—®š—» š—šš—²š—æš—ŗš—®š—»š˜†-š—Æš—®š˜€š—²š—± (š—˜š—Ø_) š—Ÿš—¶š—°š—²š—»š˜€š—²š—± š—˜š—¹š—²š—°š˜š—æš—¶š—°š—®š—¹ š—˜š—»š—“š—¶š—»š—²š—²š—æ š˜„š—¶š˜š—µ šŸ“+ š˜†š—²š—®š—æš˜€ š—¼š—³ š—²š˜…š—½š—²š—æš˜š—¶š˜€š—² š—¶š—» š—¦š—¼š—¹š—®š—æ š—£š—©, š—•š—®š˜š˜š—²š—æš˜† š—˜š—»š—²š—æš—“š˜† š—¦š˜š—¼š—æš—®š—“š—² (š—•š—˜š—¦š—¦), š—®š—»š—± š—›š˜†š—Æš—æš—¶š—± š—„š—²š—»š—²š˜„š—®š—Æš—¹š—² š—˜š—»š—²š—æš—“š˜† š—¦š˜†š˜€š˜š—²š—ŗš˜€ (š—Ŗš—¶š—»š—± š—˜š—»š—²š—æš—“š˜† & š—›š˜†š—±š—æš—¼š—“š—²š—» š˜š—²š—°š—µš—»š—¼š—¹š—¼š—“š˜†). I specialize in designing, modeling, and implementing on-grid, off-grid, and hybrid solar projects for residential, commercial, agricultural, and industrial applications.

š—Ŗš—µš—®š˜ š—œ š—¢š—³š—³š—²š—æ:

š—¦š—¼š—¹š—®š—æ š—£š—© š—¦š˜†š˜€š˜š—²š—ŗ š——š—²š˜€š—¶š—“š—» & š—¦š—¶š—ŗš˜‚š—¹š—®š˜š—¶š—¼š—» – 2D/3D layouts, shading analysis, energy yield, ROI, and payback calculations using PVSyst, Helioscope, Aurora, OpenSolar, AutoCAD, SketchUp and manymore.

š—•š—®š˜š˜š—²š—æš˜† & š—˜š—»š—²š—æš—“š˜† š—¦š˜š—¼š—æš—®š—“š—² š—œš—»š˜š—²š—“š—æš—®š˜š—¶š—¼š—» – sizing, hybrid systems, microgrids, and EV charging stations.

š—£š—²š—æš—ŗš—¶š˜š˜š—¶š—»š—“ & š——š—¼š—°š˜‚š—ŗš—²š—»š˜š—®š˜š—¶š—¼š—»ā€“ permit-ready designs, SLDs, wiring diagrams, BOMs, and compliance with IEEE, IEC, NEC, NFPA, AS/NZ codes.

š—£š—æš—¼š—·š—²š—°š˜ š—¦š˜‚š—½š—½š—¼š—æš˜ – on-site troubleshooting, cost estimation, proposal preparation, and end-to-end project management (kW → MW).

š—£š—æš—²-š—¦š—®š—¹š—²š˜€ & š—£š—¼š˜€š˜-š—¦š—®š—¹š—²š˜€ – lead generation, energy yield assessment, feasibility studies, and client consultation throughout the project.

I combine š˜š—²š—°š—µš—»š—¶š—°š—®š—¹ š—²š˜…š—½š—²š—æš˜š—¶š˜€š—², š—æš—²š—“š˜‚š—¹š—®š˜š—¼š—æš˜† š—øš—»š—¼š˜„š—¹š—²š—±š—“š—², š—®š—»š—± š—½š—æš—¼š—·š—²š—°š˜ š—ŗš—®š—»š—®š—“š—²š—ŗš—²š—»š˜ to deliver š—®š—°š—°š˜‚š—æš—®š˜š—², š—°š—¼š—ŗš—½š—¹š—¶š—®š—»š˜, š—®š—»š—± š—¼š—½š˜š—¶š—ŗš—¶š˜‡š—²š—± š˜€š—¼š—¹š—®š—æ + š—•š—˜š—¦š—¦ š˜€š—¼š—¹š˜‚š˜š—¶š—¼š—»š˜€. Let’s discuss how I can help your project succeed.
…………………………………………………………………………………………..
Thank you for visiting my profile!

Steps for completing your project

After purchasing the project, send requirements so Engr Sajjad can start the project.

Delivery time starts when Engr Sajjad receives requirements from you.

Engr Sajjad works on your project following the steps below.

Revisions may occur after the delivery date.

Submitting requirements

I will gi through the Submitted requirements

Review the work, release payment, and leave feedback to Engr Sajjad.