You will get Industrial steel structures design modelling, 2d and 3d drafting
Favour D.
You will get Industrial steel structures design modelling, 2d and 3d drafting
Favour D.
Project details
You will get a complete set of construction drawings for approval by state or county. Your package depending on your choice, will ensure all requirements, specifications, construction notes, details are available. Your drawings./ models will be free of ambiguous parts that will make builders guessing. That shall be very clear and made with most recent software technologies
Field of Expertise
Structural EngineeringBuilding Type
IndustrialBIM Software
Autodesk Revit, Autodesk AutoCAD, Autodesk Civil 3DFile Format
RVT, DWG, 3DM, FBX, OtherWhat's included
Service Tiers |
Starter
$150
|
Standard
$320
|
Advanced
$600
|
---|---|---|---|
Delivery Time | 6 days | 8 days | 14 days |
Number of Revisions | 1 | 2 | 5 |
Number of 2D Drawings | 5 | 8 | 15 |
Level of Detail | 3 | 6 | 10 |
Number of Renderings | 1 | 3 | 10 |
Design Analysis | - | ||
Architectural Walkthrough | - | - | |
Native BIM Source Files | |||
Model Audit & Verification |
Optional add-ons
You can add these on the next page.
Fast Delivery
+$50 - $300
Additional Revision
+$10
Additional 2D Drawing
(+ 1 Day)
+$5
Design Analysis
(+ 1 Day)
+$20
Architectural Walkthrough
(+ 1 Day)
+$50Frequently asked questions
About Favour
Engineering Design and infrastructures modeling
Warri, Nigeria - 3:16 pm local time
Licensed Civil Structural Engineer with over 18 years of experience in performing construction engineering projects. Particular expertise in directing early works, earthworks, concrete works, installation of underground utilities and demolition on green and brownfield projects worldwide engineering designs Identifies and addresses challenges during construction and overcomes obstacles. Leader in quality assurance and value engineering. Experienced manager of large and complex projects and supervision of project management personnel.
Steps for completing your project
After purchasing the project, send requirements so Favour can start the project.
Delivery time starts when Favour receives requirements from you.
Favour works on your project following the steps below.
Revisions may occur after the delivery date.
Milestone
Work shall be phased to reflect milestones. This will be agreed between the two of us.