You will get Telecom & Security Low voltage estimation material takeoff & cost Estimate
Top Rated

Project details
This project involves providing accurate and detailed low-voltage quantity takeoffs and cost estimates based on construction drawings and specifications. The scope includes systems such as structured cabling (data/voice), CCTV, access control, fire alarm, AV, nurse call, and other ELV systems as required.Using Planswift and Bluebeam, all devices, cabling, pathways, and accessories are carefully quantified and organized. The final deliverables include a clear, bid-ready Excel estimate with material, labor, and equipment breakdowns, aligned with project specifications and applicable codes.The goal is to eliminate missed scope, improve pricing accuracy, and support contractors with reliable estimates for competitive bidding and successful project execution.
Field of Expertise
Structural EngineeringBuilding Type
Office & Work SpaceBIM Software
Bluebeam Revu, OtherFile Format
DWGWhat's included
| Service Tiers |
Starter
$70
|
Standard
$100
|
Advanced
$150
|
|---|---|---|---|
| Delivery Time | 1 day | 1 day | 2 days |
Number of Revisions | 1 | 2 | 2 |
Frequently asked questions
13 reviews
(12)
(1)
(0)
(0)
(0)
This project doesn't have any reviews.
YT
Yohannes T.
Feb 9, 2026
1990 K st estimation
BB
Brian B.
Dec 17, 2025
Low Voltage Estimator
YT
Yohannes T.
Nov 3, 2025
Facade estimation
YT
Yohannes T.
Sep 6, 2025
Telecom and data estimation
Imran is quick and responsive.
YT
Yohannes T.
Sep 6, 2025
Telecom and data estimation -COAT Arena Suites and Restroom
About Imran
Low voltage Estimater (Telecom, Security, AV System, Fiber & Cat6)
100%
Job Success
Lahore, Pakistan - 8:23 pm local time
Steps for completing your project
After purchasing the project, send requirements so Imran can start the project.
Delivery time starts when Imran receives requirements from you.
Imran works on your project following the steps below.
Revisions may occur after the delivery date.
You complete the project following the steps that you add here.
Check off steps in the project workroom to keep your client up-to-date on the progress




