You will get the best material takeoff and construction estimating services.


Project details
Hi,
Hopefully, you will be doing great. I am a Civil Engineer and I offer material takeoff and building cost estimation services. I have 5+ years of experience in material takeoff & building cost estimation & I worked on 800+ Pre-Bid & Post-Bid Construction Projects. Softwares which I use are Plan-Swift and Bluebeam Revu.
I have worked on multiple types of structures & covered all CSI divisions such as:
Structures:
1. Concrete frame structures
2. Wood-framed Structures
3. Steel Frame Structures
4. Site Works
5. Renovation
6. Grading
7. MEP works
8. Masonry
CSI Divsions:
02 00 00 - Existing Conditions
03 00 00 - Concrete
04 00 00 - Masonry
05 00 00 - Metals
06 00 00 - Plastic, Wood & Composites
07 00 00 - Thermal & Moisture protection
08 00 00 - Openings
09 00 00 - Finishes
10 00 00 - Specialties
11 00 00 - Equipment
12 00 00 - Furnishings
22 00 00 - Plumbing
23 00 00 - HVAC
26 00 00 - Electrical
31 00 00 - Earthwork
For pricing purposes, I use RS Means and further revise the prices by the client's recommendation and take help from the previous estimates.
I can provide you with quality work with timely delivery.
For further queries, please feel free to contact me.
Hopefully, you will be doing great. I am a Civil Engineer and I offer material takeoff and building cost estimation services. I have 5+ years of experience in material takeoff & building cost estimation & I worked on 800+ Pre-Bid & Post-Bid Construction Projects. Softwares which I use are Plan-Swift and Bluebeam Revu.
I have worked on multiple types of structures & covered all CSI divisions such as:
Structures:
1. Concrete frame structures
2. Wood-framed Structures
3. Steel Frame Structures
4. Site Works
5. Renovation
6. Grading
7. MEP works
8. Masonry
CSI Divsions:
02 00 00 - Existing Conditions
03 00 00 - Concrete
04 00 00 - Masonry
05 00 00 - Metals
06 00 00 - Plastic, Wood & Composites
07 00 00 - Thermal & Moisture protection
08 00 00 - Openings
09 00 00 - Finishes
10 00 00 - Specialties
11 00 00 - Equipment
12 00 00 - Furnishings
22 00 00 - Plumbing
23 00 00 - HVAC
26 00 00 - Electrical
31 00 00 - Earthwork
For pricing purposes, I use RS Means and further revise the prices by the client's recommendation and take help from the previous estimates.
I can provide you with quality work with timely delivery.
For further queries, please feel free to contact me.
Project Scale
BuildingBuilding Type
Commercial, Institutional & Public, ResidentialFile Format
PDFWhat's included
| Service Tiers |
Starter
$150
|
Standard
$300
|
Advanced
$600
|
|---|---|---|---|
| Delivery Time | 3 days | 3 days | 6 days |
Number of Sq. Ft. | 50000 | 3000 | 40000 |
Number of Revisions | Unlimited | Unlimited | Unlimited |
3D Modeling | - | - | - |
Mood Board & Inspiration | - | - | - |
Source Files | |||
High Level of Details |
Optional add-ons
You can add these on the next page.
Fast Delivery
+$50 - $100About Aaqib
Civil Engineer |Quantity Surveying, Material Take-offs/Cost Estimation
Rawalpindi, Pakistan - 12:46 pm local time
I have a well grip on all the CSI Divisions such as;
02 00 00 - Existing Conditions
03 00 00 - Concrete
04 00 00 - Masonry
05 00 00 - Metals
06 00 00 - Plastic, Wood & Composites
07 00 00 - Thermal & Moisture protection
08 00 00 - Openings
09 00 00 - Finishes
10 00 00 - Specialties
11 00 00 - Equipment
12 00 00 - Furnishings
22 00 00 - Plumbing
23 00 00 - HVAC
26 00 00 - Electrical
31 00 00 - Earthwork
Also, I have worked on all type of structures such as;
1.Concrete framed structures
2.Wood framed structures
3.Steel framed structures
4.Site works
5.Renovations
6.MEP Works
7.Grading
8.Masonry
For pricing purpose, I use RS Means and further revise the prices by client's recommendation and take help from the previous estimates.
I can provide you quality work with timely delivery.
For further queries, please feel free to contact me.
Steps for completing your project
After purchasing the project, send requirements so Aaqib can start the project.
Delivery time starts when Aaqib receives requirements from you.
Aaqib works on your project following the steps below.
Revisions may occur after the delivery date.
Project Delivery
Upon completion of the job, I will provide the marked plans and detailed estimate file in excel format

