You will get Laravel Version Upgrade - Test-Green Before Cutover


Project details
You'll get a Laravel version upgrade that doesn't break production. Test suite green on the target version BEFORE cutover, deprecation map produced BEFORE code changes, rollback runbook rehearsed BEFORE deploy.
Three departures from "bump version and pray": deprecation inventory first (Rector + static analysis produces a CSV of every deprecated call site, so fix scope is known not exploratory), test suite green BEFORE cutover (no "we'll fix the failing tests after deploy"), staged rollout with rehearsed rollback (staging soak, canary cutover, documented rollback path with a <10-min revert window).
Base: 2 minor hops + deprecation refactor + breaking-change writeup. Add-ons: major version hop, production cutover + 14-day monitoring, PHP version upgrade.
Senior full-stack engineer who has done Laravel 5 → 11 upgrades on apps with 2,000+ tests. Built to not break production.
Scope locks at Phase 1 sign-off, calendar days lock at purchase, price fixed upfront.
Three departures from "bump version and pray": deprecation inventory first (Rector + static analysis produces a CSV of every deprecated call site, so fix scope is known not exploratory), test suite green BEFORE cutover (no "we'll fix the failing tests after deploy"), staged rollout with rehearsed rollback (staging soak, canary cutover, documented rollback path with a <10-min revert window).
Base: 2 minor hops + deprecation refactor + breaking-change writeup. Add-ons: major version hop, production cutover + 14-day monitoring, PHP version upgrade.
Senior full-stack engineer who has done Laravel 5 → 11 upgrades on apps with 2,000+ tests. Built to not break production.
Scope locks at Phase 1 sign-off, calendar days lock at purchase, price fixed upfront.
Programming Languages
PHP, HTML & CSS, JavaScriptCoding Expertise
Performance OptimizationWhat's included $2,800
These options are included with the project scope.
$2,800
- Delivery Time 14 days
- Number of Revisions 2
Optional add-ons
You can add these on the next page.
Fast 10 Days Delivery
+$800
Additional Revision
+$200
Major version hop
(+ 5 Days)
+$1,500
Prod cutover + 14-day monitoring
(+ 7 Days)
+$2,000
PHP version upgrade
(+ 4 Days)
+$800Frequently asked questions
About Philip
AI Engineer & Full-Stack Developer | Claude, MCP, AWS Bedrock | 15+ Yr
Highlands Ranch, United States - 7:10 am local time
Where I focus:
• AI integration & agentic systems — Claude and LLM integration in production apps, MCP server work, multi-agent orchestration. 7 Anthropic certifications including Claude API, MCP, and Claude Code, plus AWS Bedrock AgentCore.
• Full-stack web development — Laravel, Next.js, React, TypeScript, Node.js. Production SaaS platforms, client portals, dashboards, e-commerce. One recent platform ships with 2,700+ automated tests.
• AWS infrastructure & DevOps — 165 AWS certifications. EC2, ECS, RDS, Lambda, IAM, VPC, CloudWatch. CI/CD with GitHub Actions. Ubuntu/Linux server administration.
• Technical audits & code reviews — 19-category framework covering security, performance, code quality, database health, accessibility, and DevOps/CI-CD, with objective 1–5 scoring and remediation plans.
Background: 15+ years shipping production software. Most recently founded ScopeForged after a long tenure as Director of Development at Cairnstack Software, where I owned architecture, hiring, code review, and the full delivery lifecycle for an inventory management SaaS platform.
Open source: 587 published packages across 8 ecosystems (npm, PyPI, Go, cratesio,
NuGet, RubyGems, Composer, Maven Central) with 10M+ downloads. Mostly small, focused TypeScript libraries — HTTP clients, retry/circuit breakers, schema validation, observability tooling.
How I work: Fixed-scope milestones, clear communication, written deliverables at every step. Happy to start with a paid technical audit so we can verify fit before committing to a larger build.
Available for: AI integration, full-stack builds, technical audits, system modernization, infrastructure work, and ongoing maintenance partnerships.
Steps for completing your project
After purchasing the project, send requirements so Philip can start the project.
Delivery time starts when Philip receives requirements from you.
Philip works on your project following the steps below.
Revisions may occur after the delivery date.
Kickoff & repo audit.
Requirements form, repo read access, current state captured (Laravel + PHP versions, deps, test suite snapshot, queue/cache drivers).
Phase 1 — deprecation inventory + hop plan.
Rector run, grep audit, static analysis. CSV of deprecated call sites with fix strategies. Hop plan documented (which versions, in what order). Cutover + rollback runbook drafted if cutover add-on purchased.







