You will get Slope Analysis on Hillside development


Project details
On a typical hillside development project in some states, it is legislation that a permit applicant must provide slope analysis (sometimes it is called stability analysis or slope density analysis). It is a color-coded graphical representation of different ranges of slopes. You give me the topo, I will color it for you (an engineering stamp is NOT included)
What's included $100
These options are included with the project scope.
$100
- Delivery Time 7 days
- Number of Revisions 1
- Number of Graphs/Charts 1
- Number of Variations 1
Optional add-ons
You can add these on the next page.
Fast 2 Days Delivery
+$50About Kay
Grading, Irrigation Design, Hydraulic Analysis, Stability Analysis,
San Leandro, United States - 9:12 am local time
Within that, 3 years with Civil 3D as well as ArcGIS.
I have expertise in landscape irrigation and grading design.
I also do slope analysis and hydraulic analysis.
Steps for completing your project
After purchasing the project, send requirements so Kay can start the project.
Delivery time starts when Kay receives requirements from you.
Kay works on your project following the steps below.
Revisions may occur after the delivery date.
Send me the topo
Send me the topo (contours) in dwg format