You will get job hazard analysis, activity hazard analysis and risk assessment

4.9

Let a pro handle the details

Buy Technical Writing services from Muhammad Nauman, priced and ready to go.
4.9

Let a pro handle the details

Buy Technical Writing services from Muhammad Nauman, priced and ready to go.

Project details

With 150+ unique Clients and over 400+ completed projects Worldwide.

I make Job Hazard Analysis, Activity Hazard Analysis, Job Safety Analysis, Risk Assessment, Safe Work Method Statements, RAMS related to the Processing, Manufacturing, Industrial, and Construction sectors.

I am an M.Sc Civil Engineer, HSE Consultant, QA/QC Manager with 10+ years of professional experience in the Construction, Engineering, Industrial, & Manufacturing sectors worldwide.
It includes:-
Activity Hazard Analysis (AHA)
Job Hazard Analysis (JHA)
Job Safety Analysis (JSA)
Risk Assessment (RA)
Hazard Identification & Risk Assessment (HIRA)
Field Level Risk Assessment (FLRA)
Task Hazard Analysis (THA)
Works at Height (WAH)
Permit to Work (PTW) Risk Evaluation
Health and Safety Plan (H&S)
Demolition, Earthmoving, Concrete, Confined Place Works
Personal Protective Equipment Plan (PPE)
Experienced in making submissions to Local Authorities, especially for UAE, NZ, AUS, KSA, CAD, UK, and USA.

Note: Please discuss your project prior to order.
Document Type
User & Training Manual
Topic
Energy, Engineering, Science, Technology, General
Language
English, Urdu
What's included
Service Tiers Starter
$35
Standard
$140
Advanced
$200
Delivery Time 2 days 3 days 5 days
Number of Revisions
1UnlimitedUnlimited
Number of Words
2000600012000
Number of Technical Illustrations
000
Consultation
Proofreading & Editing
Additional Research
References & Citations
Formatted Style Guide
Optional add-ons You can add these on the next page.
Fast Delivery
+$35 - $190
Additional 100 Words (+ 1 Day)
+$2
Presentation (+ 1 Day)
+$50
Checklist (+ 1 Day)
+$50
Wbs And Schedule (+ 1 Day)
+$50

Frequently asked questions

4.9
15 reviews
93% Complete
1% Complete
(0)
7% Complete
1% Complete
(0)
1% Complete
(0)

AM

Angel M.
5.00
Jul 1, 2025
Updation of ERP and Safety Manual Highly recommend, very quick to respond and quick to finish projects. will definitely hire him in the future

AM

Angel M.
5.00
Jun 27, 2025
60 minute consultation

KM

Katrina M.
5.00
Apr 3, 2025
Update and Amend SWMS as per the listed questions provided Very happy with the documents produced. Muhammad exceeded timing Deadlines.

BA

Bill A.
5.00
Dec 28, 2024
Quality Control Plan Phase 2 It was a pleasure working with Muhammad Nauman Azhar on both Phase 1 and Phase 2 of our project. For Phase 2, he developed a comprehensive and well-structured Quality Control Plan that seamlessly built upon the work done in Phase 1. Muhammad’s attention to detail, in-depth industry knowledge, and ability to address specific project requirements stood out throughout the process. He is responsive, reliable, and always delivers on time. His work has been instrumental in ensuring the quality and compliance of our project. I highly recommend Muhammad to the Upwork community as a top-tier professional who consistently exceeds expectations.

BA

Bill A.
5.00
Dec 28, 2024
04 ITP Reports for Phase 1 I had an excellent experience working with Muhammad Nauman Azhar on the development of an Inspection and Test Plan (ITP) for Phase 1 of our project. The ITP covered key trades such as Grease Trap, Water Service Relocation, Earthwork, and Concrete Foundations. Muhammad’s ability to understand complex project requirements and translate them into a clear, actionable document was impressive. He was proactive in communication, adhered to deadlines, and delivered work of the highest quality. His meticulous attention to detail and industry knowledge made the entire process seamless. I highly recommend Muhammad to the Upwork community as a reliable and skilled professional who consistently exceeds expectations.
Muhammad Nauman A.Status: Offline

About Muhammad Nauman

Muhammad Nauman A.Status: Offline
Civil Engineer-Health and Safety Professional
100% Job Success
4.9  (15 reviews)
Jhang, Pakistan - 1:59 am local time
An M.Sc Civil Engineer, Certified PMP, NEBOSH, and QA/QC Manager with 10 years of professional experience in the Construction, Engineering, Industrial, and Manufacturing sectors. I am experienced in making submissions to Local Authorities with a guarantee of approval, especially for the Middle East, the UK, Australia, and the USA.
My expertise includes:
1. Method Statement/RAMS/SWMS
2. Health and Safety Documentation
3. ISO Manuals (9001, 45001, 41001 etc)
4. Contract Management (FIDIC, ADB, WB)
5. Planning & Scheduling (P6, MS Project, Excel)

Contact me for quality documentation and assistance.

Steps for completing your project

After purchasing the project, send requirements so Muhammad Nauman can start the project.

Delivery time starts when Muhammad Nauman receives requirements from you.

Muhammad Nauman works on your project following the steps below.

Revisions may occur after the delivery date.

1- Share your project details. 2- Timelines.

Review the work, release payment, and leave feedback to Muhammad Nauman.